South West Eco Energy
Plymouth-based solar PV and battery storage specialists serving domestic and commercial customers since 2010
16+
Years in Business
60 km
Service Area
1-10
Employees
SurgePV Score
About South West Eco Energy
South West Eco Energy is a Plymouth-based renewable energy company with a registered address at Suite 127, 91 Mayflower Street, Devon, PL1 1SB, and an operational base at Unit 7, Devonshire Meadows, Broadley Park Road, Roborough, Plymouth, Devon. The company has been MCS certified since 19 March 2010 (certificate number NAP 12804), making it one of the longer-established MCS accredited installers in the Plymouth area.
The company specialises in solar PV and battery storage for domestic and commercial clients throughout Plymouth and the South West. Their approach focuses on helping customers reduce energy costs and carbon footprint through high-quality renewable product installations. South West Eco Energy can be contacted on 01752 562221.
Customer reviews reflect a positive experience across the entire project lifecycle. Reviewers specifically name team members Chris and Andy for their responsiveness, willingness to listen, and practical assistance with installation paperwork and any remedial works required. This hands-on, customer-focused approach is a consistent theme across feedback.
The company’s long history of MCS certification — dating back to 2010 — demonstrates sustained commitment to quality standards and ongoing compliance with the UK’s renewable energy installation requirements. South West Eco Energy is a reliable choice for Plymouth homeowners and businesses seeking an established local installer with a proven track record.
Service Area
South West Eco Energy serves the following areas within a 60 km radius:
Contact Information
Are you South West Eco Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
0
0 reviews
Verified Customer
From quote to survey, installation and commissioning, the SW Eco Energy team were knowledgeable, quick to respond and good at listening. Chris and Andy helped with all the paperwork too.
Verified Customer
Very helpful and informative throughout the whole process. Would not hesitate to recommend South West Eco Energy to anyone looking for solar panels in Plymouth.
Frequently Asked Questions About South West Eco Energy
What services does South West Eco Energy offer?
South West Eco Energy offers Solar Installation, Battery Storage.
Is South West Eco Energy MCS certified?
Yes, South West Eco Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does South West Eco Energy serve?
South West Eco Energy serves Plymouth, Devon, Cornwall, South West. They are based in Plymouth with a service radius of 60 km.
What warranty does South West Eco Energy offer?
South West Eco Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are South West Eco Energy's customer reviews?
South West Eco Energy does not have any reviews yet. Be the first to leave a review after using their services.
How long has South West Eco Energy been in business?
South West Eco Energy was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Plymouth
Get a Free Solar Quote from South West Eco Energy
Fill in your details and we'll connect you with South West Eco Energy.
Quote request sent!
South West Eco Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile