SS

Southern Solar

BBB A+ rated solar installer serving Hampton Roads with residential and commercial solar panels, battery storage, and EV charging since 2008

Virginia Beach, Virginia
5 (25 reviews)
Verified
Residential Commercial

18+

Years in Business

0

25

Customer Reviews

93 mi

Service Area

11-50

Employees

SurgePV Score

9.4 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Southern Solar

Southern Solar is a solar installation company based at 511 Campostella Road, Suite 201 in Norfolk, Virginia, serving the entire Hampton Roads region including Virginia Beach. Established in 2008, the company has over 17 years of experience in residential and commercial solar panel installation, battery storage systems, Generac generator installation, EV charging stations, and system maintenance. Southern Solar holds a BBB A+ rating and has been BBB Accredited since October 2023.

The company provides comprehensive solar services from initial consultation and roof assessment through system design, permitting, installation, and ongoing maintenance. Southern Solar is REC Certified and uses quality components from manufacturers including REC panels and Generac battery systems. The company emphasizes customer education and transparent pricing throughout the solar adoption process.

Southern Solar serves customers across Virginia and North Carolina, including Virginia Beach, Norfolk, Chesapeake, Portsmouth, Suffolk, Newport News, Hampton, Williamsburg, Richmond, and surrounding communities.

Service Area

Southern Solar serves the following areas within a 93-mile radius:

Virginia BeachNorfolkChesapeakePortsmouthSuffolkNewport NewsHamptonWilliamsburgRichmond

Are you Southern Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Solar Design
Battery Storage
Maintenance
EV Charging
Roof Assessment

Certifications & Accreditations

BBB A+ Rating BBB Accredited REC Certified

Partner Manufacturers

Panels

REC

Batteries

Generac

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

25 reviews

Brian D.

12 October 2025
Verified Customer

Southern Solar did a fantastic job on our residential system. The team was knowledgeable and professional throughout the entire process. Our electricity bill has dropped significantly since installation.

Patricia W.

25 July 2025
Verified Customer

We had Southern Solar install panels on our commercial building. They handled all the engineering and permitting. The crew was efficient and the system is producing above expectations.

James M.

3 April 2025
Verified Customer

Excellent company to work with. They installed our solar system and a Generac battery backup. The whole project was completed on time and the team explained everything clearly.

Frequently Asked Questions About Southern Solar

What services does Southern Solar offer?

Southern Solar offers Solar Installation, Solar Design, Battery Storage, Maintenance, EV Charging, Roof Assessment.

Is Southern Solar NABCEP certified?

Southern Solar holds the following certifications: BBB A+ Rating, BBB Accredited, REC Certified. Contact them directly for the latest accreditation details.

What areas does Southern Solar serve?

Southern Solar serves Virginia Beach, Norfolk, Chesapeake, Portsmouth, Suffolk, Newport News, Hampton, Williamsburg and 1 other areas. They are based in Virginia Beach with a service radius of 150 km.

What warranty does Southern Solar offer?

Southern Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Southern Solar's customer reviews?

Southern Solar has a 5/5 rating based on 25 customer reviews. Customers consistently rate them highly.

How long has Southern Solar been in business?

Southern Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Southern Solar

Fill in your details and we'll connect you with Southern Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote