Unlimited Solar
Family-operated BBB accredited solar company in Virginia Beach offering residential, commercial, and agricultural solar installations
6+
Years in Business
20
Customer Reviews
62 mi
Service Area
2-10
Employees
SurgePV Score
About Unlimited Solar
Unlimited Solar is a locally owned and family-operated solar energy company based at 936 General Booth Boulevard, Suite B in Virginia Beach, Virginia. Incorporated in 2020 and BBB Accredited since December 2020, the company serves residential, commercial, and agricultural customers across the Hampton Roads region. Unlimited Solar maintains a BBB A rating and a 5.0-star average across review platforms.
The company provides solar panel installation, battery storage, energy audits, and financing assistance. Unlimited Solar operates Monday through Friday with Saturday availability and emphasizes personalized service with direct access to company owners throughout the project. The team handles system design, permitting, installation, and post-installation support.
Unlimited Solar serves Virginia Beach, Chesapeake, Norfolk, Suffolk, and Newport News. Customers consistently praise the company for its transparent communication, professionalism, and hands-on approach to solar installation.
Service Area
Unlimited Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Unlimited Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
20 reviews
Lisa K.
Unlimited Solar made the whole process simple and stress-free. David and Ray were friendly, professional, and willing to answer every question. Our panels are producing exactly what they estimated.
Mark J.
We chose Unlimited Solar because they are locally owned and family-operated. The customer service was exceptional from start to finish. They handled all the permitting and the installation was completed on schedule.
Angela S.
Great experience with this company. They took the time to explain the solar options and helped us find financing that worked for our budget. The installation crew was courteous and professional.
Frequently Asked Questions About Unlimited Solar
What services does Unlimited Solar offer?
Unlimited Solar offers Solar Installation, Solar Design, Battery Storage, financing_assistance, Energy Audit.
Is Unlimited Solar NABCEP certified?
Unlimited Solar holds the following certifications: BBB Accredited, BBB A Rating. Contact them directly for the latest accreditation details.
What areas does Unlimited Solar serve?
Unlimited Solar serves Virginia Beach, Chesapeake, Norfolk, Suffolk, Newport News. They are based in Virginia Beach with a service radius of 100 km.
What warranty does Unlimited Solar offer?
Unlimited Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Unlimited Solar's customer reviews?
Unlimited Solar has a 5/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Unlimited Solar been in business?
Unlimited Solar was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.
Similar Installers in Virginia Beach
Get a Free Solar Quote from Unlimited Solar
Fill in your details and we'll connect you with Unlimited Solar.
Quote request sent!
Unlimited Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile