Spark Building Energy Solutions
Certified energy management and solar installation firm serving Metro Detroit since 2009
17+
Years in Business
800+
Projects Completed
65
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Spark Building Energy Solutions
Spark Building Energy Solutions is a Livonia-based energy services company established in 2009, offering solar panel installation, battery storage, EV charging, and comprehensive energy management for residential and commercial clients throughout Metro Detroit. The company stands out for its team of certified professionals, including NABCEP-certified solar installers, Certified Energy Managers (C.E.M.) from the Association of Energy Engineers, and BPI-certified building analysts.
The company takes a whole-building approach to energy, often pairing solar installations with energy audits and efficiency improvements to maximize savings. Spark installs REC solar panels with Enphase and SolarEdge inverters, and specializes in Generac PWRcell battery storage systems as a certified Generac installer. Additional services include EV charging station installation and ongoing system monitoring and maintenance.
Spark Building Energy Solutions holds an A+ rating with the Better Business Bureau and has earned positive reviews for transparency, technical expertise, and installation quality. Their office at 32401 W 8 Mile Road in Livonia is centrally located to serve communities across Wayne, Oakland, and Washtenaw counties, including Detroit, Dearborn, Ann Arbor, and Farmington Hills.
Service Area
Spark Building Energy Solutions serves the following areas within a 50-mile radius:
Contact Information
Are you Spark Building Energy Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
65 reviews
Angela R.
Spark Building Energy did a comprehensive energy audit before designing our solar system. They identified insulation issues we didn't know about, fixed those first, then sized our solar array accordingly. Our energy costs dropped dramatically.
David H.
The team at Spark was honest and transparent from day one. They walked us through every option without any pressure tactics. The Generac PWRcell battery has given us peace of mind during storms, and the solar panels are producing more than projected.
Karen S.
Professional installation and knowledgeable staff. They clearly understand both the energy efficiency side and the solar side, which sets them apart. The only improvement would be faster scheduling during peak season.
Frequently Asked Questions About Spark Building Energy Solutions
What services does Spark Building Energy Solutions offer?
Spark Building Energy Solutions offers Solar Installation, Battery Storage, Solar Design, Energy Audit, EV Charging, Monitoring, Maintenance.
Is Spark Building Energy Solutions NABCEP certified?
Yes, Spark Building Energy Solutions is NABCEP certified and also holds Certified Energy Manager (C.E.M.), BPI Building Analyst, Generac Certified Installer, REC Group Solar Partner, BBB A+ Rating certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Spark Building Energy Solutions serve?
Spark Building Energy Solutions serves Detroit, Livonia, Dearborn, Ann Arbor, Farmington Hills, Novi, Plymouth, Canton and 2 other areas. They are based in Detroit with a service radius of 80 km.
What warranty does Spark Building Energy Solutions offer?
Spark Building Energy Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Spark Building Energy Solutions's customer reviews?
Spark Building Energy Solutions has a 4.7/5 rating based on 65 customer reviews. Customers consistently rate them highly.
How long has Spark Building Energy Solutions been in business?
Spark Building Energy Solutions was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Detroit
Get a Free Solar Quote from Spark Building Energy Solutions
Fill in your details and we'll connect you with Spark Building Energy Solutions.
Quote request sent!
Spark Building Energy Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile