Stellar Solar
25+ years of solar and battery installation experience with 15,000+ systems installed nationwide
28+
Years in Business
15,000+
Projects Completed
350
Customer Reviews
62 mi
Service Area
51-200
Employees
SurgePV Score
About Stellar Solar
Stellar Solar is one of the most experienced solar installers operating in the Detroit metropolitan area, with roots dating back to 1998 and over 15,000 solar systems installed across the country. The company’s Michigan headquarters is located on Woodward Avenue in Royal Oak, with a satellite office in Suttons Bay serving northern Michigan. Stellar Solar specializes in residential and commercial solar panel installations, ground-mounted systems, EV charging stations, and battery storage.
The company is a Certified Premier Installer of the Tesla Powerwall 3 and also installs Enphase battery systems. Panel offerings include SunPower modules, paired with Enphase and SolarEdge inverters. Stellar Solar handles the full project lifecycle in-house, from initial design and engineering through permitting, installation, and system activation. All installations include monitoring capabilities so homeowners can track production in real time.
Stellar Solar holds an A+ rating from the Better Business Bureau and maintains a 5-star rating on Angi with thousands of positive reviews across Google, Yelp, and SolarReviews. The company serves Wayne, Oakland, Macomb, and Washtenaw counties, covering the core Detroit metro area as well as communities in northern lower Michigan from their Suttons Bay location.
Service Area
Stellar Solar serves the following areas within a 62-mile radius:
Contact Information
Are you Stellar Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
350 reviews
Thomas G.
David from Stellar Solar worked with our schedule and iterated through several design options before we settled on the right system. They supported us through every step, including some unexpected hurdles with our utility interconnection. The Powerwall 3 has been great during outages.
Lisa C.
After getting quotes from several companies, we went with Stellar Solar for their experience and Tesla Premier Installer certification. The installation was clean and professional, and our 10 kW system is producing exactly what was projected.
James P.
Quality installation and good equipment choices. The system has been performing well. My only minor complaint is that post-installation customer service could be more responsive, but when I did reach someone, they resolved my question quickly.
Frequently Asked Questions About Stellar Solar
What services does Stellar Solar offer?
Stellar Solar offers Solar Installation, Battery Storage, Solar Design, EV Charging, Monitoring, Maintenance, ground_mount.
Is Stellar Solar NABCEP certified?
Stellar Solar holds the following certifications: Tesla Certified Premier Installer, BBB A+ Rating. Contact them directly for the latest accreditation details.
What areas does Stellar Solar serve?
Stellar Solar serves Detroit, Royal Oak, Birmingham, Troy, Warren, Sterling Heights, Ann Arbor, Southfield and 2 other areas. They are based in Detroit with a service radius of 100 km.
What warranty does Stellar Solar offer?
Stellar Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Stellar Solar's customer reviews?
Stellar Solar has a 4.8/5 rating based on 350 customer reviews. Customers consistently rate them highly.
How long has Stellar Solar been in business?
Stellar Solar was founded in 1998 and has been in business for 28 years. They are one of the more experienced solar installers in their area.
Similar Installers in Detroit
Get a Free Solar Quote from Stellar Solar
Fill in your details and we'll connect you with Stellar Solar.
Quote request sent!
Stellar Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile