Strawberry Solar
Detroit-based turnkey solar installer with 14+ years of experience serving Michigan's lower peninsula
16+
Years in Business
1,500+
Projects Completed
85
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About Strawberry Solar
Strawberry Solar is a Detroit-headquartered solar installation company founded in 2010, specializing in residential and commercial photovoltaic systems across Michigan’s lower peninsula. The company operates as a turnkey provider, handling every phase of a solar project from initial site assessment and system design through permitting, installation, and commissioning. Strawberry Solar partners with Cass Community Social Services to bring solar power to low-income families in the Detroit metropolitan area.
The company installs panels from leading manufacturers including Canadian Solar, Panasonic, and Solaria, paired with SolarEdge and Enphase inverters. Battery storage options from Generac are available for homeowners seeking backup power capability. Strawberry Solar also installs electric vehicle charging stations and provides ongoing system monitoring and maintenance services. All installations carry a 25-year manufacturer warranty on panels, a 25-year inverter warranty, and a 10-year workmanship guarantee.
With over 14 years of experience and an estimated 1,500 completed projects, Strawberry Solar has built a strong reputation in the Detroit solar market. The company holds BBB accreditation and maintains positive ratings across Google, Yelp, and EnergySage. Their service territory covers the full lower peninsula of Michigan, with the majority of installations concentrated in the Metro Detroit, Ann Arbor, Lansing, and Flint areas.
Service Area
Strawberry Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Strawberry Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
85 reviews
Marcus T.
Strawberry Solar made our transition to solar seamless. From the initial consultation to the final inspection, they kept us informed at every step. Our electric bill dropped by about 80% in the first full month of operation.
Danielle W.
We compared quotes from five different companies and Strawberry Solar offered the best combination of price, equipment quality, and local expertise. The installation crew was respectful and finished a day ahead of schedule.
Robert J.
Good experience overall. The system is performing well and the monitoring app is easy to use. The permitting process took a bit longer than expected, but the team was transparent about the timeline throughout.
Frequently Asked Questions About Strawberry Solar
What services does Strawberry Solar offer?
Strawberry Solar offers Solar Installation, Battery Storage, Solar Design, EV Charging, Monitoring, Maintenance.
Is Strawberry Solar NABCEP certified?
Strawberry Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Strawberry Solar serve?
Strawberry Solar serves Detroit, Ann Arbor, Dearborn, Livonia, Warren, Sterling Heights, Southfield, Royal Oak and 2 other areas. They are based in Detroit with a service radius of 150 km.
What warranty does Strawberry Solar offer?
Strawberry Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Strawberry Solar's customer reviews?
Strawberry Solar has a 4.7/5 rating based on 85 customer reviews. Customers consistently rate them highly.
How long has Strawberry Solar been in business?
Strawberry Solar was founded in 2010 and has been in business for 16 years. They are one of the more experienced solar installers in their area.
Similar Installers in Detroit
Get a Free Solar Quote from Strawberry Solar
Fill in your details and we'll connect you with Strawberry Solar.
Quote request sent!
Strawberry Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile