Sun Solar
Missouri-based in-house solar installer since 2012, with Kansas City office serving residential and commercial customers across the metro
14+
Years in Business
90
Customer Reviews
124 mi
Service Area
51-200
Employees
SurgePV Score
About Sun Solar
Sun Solar is a Missouri-based solar installation company founded in 2012, with a regional office in the Kansas City area serving customers across the metro and into eastern Kansas. The company is headquartered in Springfield, Missouri, and maintains offices and warehouses in Kansas City and St. Louis to provide local service across the state. Sun Solar employs its entire installation team in-house rather than subcontracting, which ensures consistent quality and accountability on every project.
The company designs, permits, installs, and services solar systems for both residential and commercial customers. Sun Solar offers a variety of installation options including rooftop and ground-mounted systems, and works with customers to identify the best equipment and financing options for their situation. The company is BBB-accredited and a member of the Green Business Network.
Sun Solar’s Kansas City team serves homeowners and businesses across the greater KC metro area, including both Missouri and Kansas sides. The company has installed more solar systems in Missouri than most competitors and brings that statewide experience to every local project. Free solar consultations are available, and the team provides detailed production estimates and financing guidance before any commitment is made.
Service Area
Sun Solar serves the following areas within a 124-mile radius:
Contact Information
Are you Sun Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
90 reviews
Nathan R.
Sun Solar's Kansas City team was professional from start to finish. They designed a system that matched our energy usage perfectly. The in-house installation crew was efficient and left our property clean. Our bills have dropped dramatically.
Maria G.
We liked that Sun Solar uses their own employees for installation rather than subcontractors. The quality of work was evident, clean wiring, secure mounting, and everything inspected before leaving. Five months in and the system is exceeding production estimates.
Kevin A.
Good Missouri solar company with a local presence in KC. The process from consultation to installation took about five weeks. The only minor issue was coordinating the utility inspection, but Sun Solar handled it. System is performing well.
Frequently Asked Questions About Sun Solar
What services does Sun Solar offer?
Sun Solar offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Maintenance, Monitoring.
Is Sun Solar NABCEP certified?
Sun Solar holds the following certifications: BBB Accredited, Green Business Network Member. Contact them directly for the latest accreditation details.
What areas does Sun Solar serve?
Sun Solar serves Kansas City, Independence, Lee's Summit, Overland Park, Olathe, Lawrence, Topeka. They are based in Kansas City with a service radius of 200 km.
What warranty does Sun Solar offer?
Sun Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sun Solar's customer reviews?
Sun Solar has a 4.7/5 rating based on 90 customer reviews. Customers consistently rate them highly.
How long has Sun Solar been in business?
Sun Solar was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.
Similar Installers in Kansas City
Get a Free Solar Quote from Sun Solar
Fill in your details and we'll connect you with Sun Solar.
Quote request sent!
Sun Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile