Sunny Side Solutions
Affordable solar and EV charging installation across Minnesota with an A BBB rating
2+
Years in Business
12
Customer Reviews
62 mi
Service Area
1-10
Employees
SurgePV Score
About Sunny Side Solutions
Sunny Side Solutions is a solar and EV charging installation company based in Burnsville, Minnesota, serving homeowners and businesses across the Twin Cities metro area. The company specializes in affordable solar panel installations, battery energy storage systems, EV charging stations, and electrical panel upgrades. Sunny Side Solutions is a licensed electrical contractor with BBB accreditation and an A rating.
The company installs pitched roof arrays, ground-mount systems, and flat roof arrays using equipment from leading manufacturers including Silfab and REC panels, Enphase, SolarEdge, and SMA inverters, and Enphase battery storage. Sunny Side Solutions also offers IronRidge mounting systems and handles electrical panel upgrades when needed to support solar and EV charging installations.
Despite being a newer entrant to the Minnesota solar market, Sunny Side Solutions has quickly earned strong customer reviews with a 4.8-star average rating. Customers highlight the company’s competitive pricing, responsive communication, and thorough installations. The company’s combined solar and EV charging expertise makes it a convenient one-stop option for homeowners looking to electrify both their home energy and transportation.
Service Area
Sunny Side Solutions serves the following areas within a 62-mile radius:
Contact Information
Are you Sunny Side Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
12 reviews
Derek M.
Sunny Side Solutions installed a solar system and EV charger at our home. The team was knowledgeable, professional, and completed everything on schedule. Pricing was very competitive compared to the larger companies we quoted.
Rachel S.
As a newer company, Sunny Side Solutions impressed us with their responsiveness and attention to detail. They handled all the permitting and utility paperwork efficiently. Our system has been performing great since day one.
Greg T.
Excellent experience from consultation to installation. The team was transparent about costs and timelines and delivered on every promise. We're already seeing significant savings on our electric bills.
Frequently Asked Questions About Sunny Side Solutions
What services does Sunny Side Solutions offer?
Sunny Side Solutions offers Solar Installation, Battery Storage, Solar Design, EV Charging, electrical_panel_upgrade.
Is Sunny Side Solutions NABCEP certified?
Yes, Sunny Side Solutions is NABCEP certified and also holds BBB A Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Sunny Side Solutions serve?
Sunny Side Solutions serves Minneapolis, Saint Paul, Burnsville, Eagan, Lakeville, Apple Valley, Bloomington, Richfield. They are based in Minneapolis with a service radius of 100 km.
What warranty does Sunny Side Solutions offer?
Sunny Side Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sunny Side Solutions's customer reviews?
Sunny Side Solutions has a 4.8/5 rating based on 12 customer reviews. Customers consistently rate them highly.
How long has Sunny Side Solutions been in business?
Sunny Side Solutions was founded in 2024 and has been in business for 2 years. They are a newer entrant in the solar installation market.
Similar Installers in Minneapolis
Get a Free Solar Quote from Sunny Side Solutions
Fill in your details and we'll connect you with Sunny Side Solutions.
Quote request sent!
Sunny Side Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile