Sunpath Solar
BBB A+ rated Jacksonville solar contractor with 18 years of installation, repair, and maintenance experience
19+
Years in Business
20
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Sunpath Solar
Sunpath Solar LLC is a Jacksonville-based solar contractor founded by James B. Engle, operating from 4851 Roselle Street, Unit 1, in Jacksonville. The company has over 18 years of experience in the solar industry and specializes in the installation, repair, maintenance, and cleaning of solar electric, pool heating, and domestic water heating systems. Sunpath Solar holds Florida Certified Solar Contractor license CVC57021, which expires in August 2026.
The company maintains a BBB A+ rating and has been BBB Accredited since September 2018. Sunpath Solar is also a HomeAdvisor Elite contractor. The team installs Qcells and Canadian Solar panels with Enphase and SolarEdge inverters, paired with Tesla Powerwall battery storage. The company handles all major solar panel brands for repair and maintenance work, regardless of the original installer.
Customers consistently note Sunpath Solar’s professionalism, efficiency, and deep local knowledge of Jacksonville permitting and utility requirements. The company’s long track record in Northeast Florida means established relationships with local building departments and utilities, which can expedite the installation process. Sunpath Solar serves Jacksonville, Orange Park, Jacksonville Beach, Atlantic Beach, Neptune Beach, and Fernandina Beach. Business hours are Monday through Friday, 8 AM to 4 PM.
Service Area
Sunpath Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Sunpath Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
20 reviews
Catherine S.
Sunpath Solar has been in the business long enough to know what works. The installation was professional and the team handled the entire permitting process. Our electric bill dropped significantly in the first full month.
David W.
James and his crew were knowledgeable and efficient. They completed the installation in one day and the system has been running smoothly since. The cleaning and maintenance service is a nice addition.
Nancy P.
Good quality work from an established local company. The system design accounted for our specific shading conditions and the production numbers have been close to the estimates provided.
Frequently Asked Questions About Sunpath Solar
What services does Sunpath Solar offer?
Sunpath Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Grid Connection, solar_panel_cleaning.
Is Sunpath Solar NABCEP certified?
Sunpath Solar holds the following certifications: BBB A+, FL Certified Solar Contractor CVC57021, HomeAdvisor Elite. Contact them directly for the latest accreditation details.
What areas does Sunpath Solar serve?
Sunpath Solar serves Jacksonville, Orange Park, Jacksonville Beach, Atlantic Beach, Neptune Beach, Fernandina Beach. They are based in Jacksonville with a service radius of 80 km.
What warranty does Sunpath Solar offer?
Sunpath Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Sunpath Solar's customer reviews?
Sunpath Solar has a 4.7/5 rating based on 20 customer reviews. Customers consistently rate them highly.
How long has Sunpath Solar been in business?
Sunpath Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Jacksonville
Get a Free Solar Quote from Sunpath Solar
Fill in your details and we'll connect you with Sunpath Solar.
Quote request sent!
Sunpath Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile