SunRenu Solar
Scottsdale-based solar company since 2008 ranked on Solar Power World's Top Solar Contractors list
18+
Years in Business
35
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About SunRenu Solar
SunRenu Solar is a privately held solar energy company founded in 2008 and based at 4300 N Miller Road, Suite 103, Scottsdale, Arizona 85251. The company specializes in solar system design, financing, installation, monitoring, and energy audits for residential and commercial customers across the Phoenix metropolitan area.
SunRenu Solar installs REC solar panels and has been ranked #232 on Solar Power World’s 2025 Top Solar Contractors list. The company holds a BuildZoom score of 107, placing it in the top 6% of 71,576 Arizona licensed contractors. SunRenu Solar is BBB-accredited and led by John McDonnell, who can be reached directly at (480) 945-5172.
The company maintains a 4.4-star Google rating from 35 reviews and serves Scottsdale, Phoenix, Tempe, Mesa, Gilbert, Chandler, and surrounding communities. Office hours are Monday through Friday, 9 AM to 5 PM.
Service Area
SunRenu Solar serves the following areas within a 50-mile radius:
Contact Information
Are you SunRenu Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.4
35 reviews
Charles P.
SunRenu Solar handled our installation professionally from start to finish. John was responsive and made sure everything was properly permitted and inspected. System has been working great.
Barbara L.
Good experience with SunRenu. They have been in business a long time which gave us confidence. The installation was clean and the system is producing as expected.
Frank T.
Went with SunRenu based on their years of experience in Arizona. They knew exactly how to optimize the system for our roof orientation and the Scottsdale sun. Very knowledgeable team.
Frequently Asked Questions About SunRenu Solar
What services does SunRenu Solar offer?
SunRenu Solar offers Solar Installation, Solar Design, Energy Audit, Monitoring, Maintenance.
Is SunRenu Solar NABCEP certified?
SunRenu Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.
What areas does SunRenu Solar serve?
SunRenu Solar serves Scottsdale, Phoenix, Tempe, Mesa, Gilbert, Chandler. They are based in Scottsdale with a service radius of 80 km.
What warranty does SunRenu Solar offer?
SunRenu Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are SunRenu Solar's customer reviews?
SunRenu Solar has a 4.4/5 rating based on 35 customer reviews. They are well-regarded by their customers.
How long has SunRenu Solar been in business?
SunRenu Solar was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.
Similar Installers in Scottsdale
Get a Free Solar Quote from SunRenu Solar
Fill in your details and we'll connect you with SunRenu Solar.
Quote request sent!
SunRenu Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile