SE

Sunrise Energy Solutions

Roseville-based solar and HVAC company serving Stockton and Northern California since 2008

Stockton, California
4.8 (40 reviews)
Verified
Residential Commercial

18+

Years in Business

0

40

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

7.9 / 10
Customer Reviews
96%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About Sunrise Energy Solutions

Sunrise Energy Solutions is a solar and HVAC company headquartered at 1780 Vernon Street, Suite 6, in Roseville, California, serving Stockton and the greater Sacramento and Northern California region. The company provides clean, reliable, and affordable solar and HVAC services to homeowners, small businesses, and large-scale commercial and agricultural operations.

Sunrise Energy Solutions handles residential and commercial solar installations along with maintenance, repairs, and financing assistance. The company’s combined solar and HVAC expertise allows them to optimize whole-home energy systems for maximum efficiency and savings.

The company maintains BBB accreditation and has earned 40 reviews on Yelp. Sunrise Energy Solutions operates Monday through Friday, 7:00 AM to 5:00 PM, and serves Stockton, Roseville, Sacramento, and communities throughout Northern California.

Service Area

Sunrise Energy Solutions serves the following areas within a 62-mile radius:

StocktonRosevilleSacramentoLodiElk GroveFolsom

Are you Sunrise Energy Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Solar Design

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

40 reviews

Larry T.

12 August 2025
Verified Customer

Sunrise Energy Solutions installed solar panels on our Stockton property. The system has been performing above projections and the team was professional throughout.

Sharon M.

18 May 2025
Verified Customer

Great company that handles both solar and HVAC. Having one contractor for both saved us money and ensured everything works together efficiently.

Dennis K.

8 February 2025
Verified Customer

Professional installation and reliable follow-up service. They handle maintenance and repairs, which gives us peace of mind with our solar investment.

Frequently Asked Questions About Sunrise Energy Solutions

What services does Sunrise Energy Solutions offer?

Sunrise Energy Solutions offers Solar Installation, Maintenance, Solar Design.

Is Sunrise Energy Solutions NABCEP certified?

Sunrise Energy Solutions holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does Sunrise Energy Solutions serve?

Sunrise Energy Solutions serves Stockton, Roseville, Sacramento, Lodi, Elk Grove, Folsom. They are based in Stockton with a service radius of 100 km.

What warranty does Sunrise Energy Solutions offer?

Sunrise Energy Solutions offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Sunrise Energy Solutions's customer reviews?

Sunrise Energy Solutions has a 4.8/5 rating based on 40 customer reviews. Customers consistently rate them highly.

How long has Sunrise Energy Solutions been in business?

Sunrise Energy Solutions was founded in 2008 and has been in business for 18 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Sunrise Energy Solutions

Fill in your details and we'll connect you with Sunrise Energy Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote