SS

SunSent Solar

Family-owned St. Louis solar and roofing company with over 20 years of local experience and 100% labor warranty

St. Louis, Missouri
4.8 (80 reviews)
Verified
Residential

10+

Years in Business

0

80

Customer Reviews

75 mi

Service Area

11-50

Employees

SurgePV Score

8.3 / 10
Customer Reviews
96%
Certifications
60%
Experience
85%
Services Range
100%
Warranty Coverage
100%
Online Presence
50%

About SunSent Solar

SunSent Solar is a family-owned solar and roofing company rooted in the St. Louis area for over 20 years. Founded in 2016, SunSent employs its entire installation team directly rather than using subcontractors, which allows for consistent quality control across every project. The company specializes in residential solar installations and also handles roofing projects, making it a practical choice for homeowners who need both services.

SunSent matches the product warranty on panels and inverters with a 100% labor warranty, meaning homeowners are covered for both equipment and workmanship over the life of the system. The company installs panels from Silfab paired with Enphase microinverters and offers battery storage through Enphase IQ systems. Each installation includes a guaranteed production estimate, so customers know what to expect from their system.

The company serves the greater St. Louis region and extends into Central and Southern Illinois. SunSent provides free solar consultations, handles all permitting and utility paperwork, and offers ongoing maintenance services to keep systems running at peak performance.

Service Area

SunSent Solar serves the following areas within a 75-mile radius:

St. LouisSt. CharlesO'FallonChesterfieldBallwinEdwardsvilleBelleville

Are you SunSent Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Roof Assessment
Solar Design
Energy Audit

Certifications & Accreditations

BBB Accredited

Partner Manufacturers

Panels

Silfab

Inverters

Enphase

Batteries

Enphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

80 reviews

Karen D.

18 August 2025
Verified Customer

SunSent was straightforward from day one. No high-pressure sales, just honest information about what solar could do for our home. The installation crew was professional and cleaned up after themselves. Our system has been producing above estimate.

Mark S.

30 May 2025
Verified Customer

We needed a new roof and solar at the same time. SunSent handled both projects together, which saved us money and headaches. The 100% labor warranty gave us peace of mind. Highly recommend.

Patricia H.

14 February 2025
Verified Customer

Solid local company. The team was knowledgeable and patient with our questions. Installation went smoothly over two days. Only reason for four stars is the initial wait time for scheduling, but the quality of work was excellent.

Frequently Asked Questions About SunSent Solar

What services does SunSent Solar offer?

SunSent Solar offers Solar Installation, Battery Storage, Maintenance, Roof Assessment, Solar Design, Energy Audit.

Is SunSent Solar NABCEP certified?

SunSent Solar holds the following certifications: BBB Accredited. Contact them directly for the latest accreditation details.

What areas does SunSent Solar serve?

SunSent Solar serves St. Louis, St. Charles, O'Fallon, Chesterfield, Ballwin, Edwardsville, Belleville. They are based in St. Louis with a service radius of 120 km.

What warranty does SunSent Solar offer?

SunSent Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are SunSent Solar's customer reviews?

SunSent Solar has a 4.8/5 rating based on 80 customer reviews. Customers consistently rate them highly.

How long has SunSent Solar been in business?

SunSent Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from SunSent Solar

Fill in your details and we'll connect you with SunSent Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote