SunState Solar
Locally owned New Mexico solar and roofing company serving Santa Fe with premium installations since 2018
8+
Years in Business
15
Customer Reviews
62 mi
Service Area
11-50
Employees
SurgePV Score
About SunState Solar
SunState Solar is a locally owned New Mexico solar and roofing company headquartered at 9440 San Mateo Boulevard NE, Suite L, Albuquerque, NM 87113. Founded in 2018, the company provides premium solar panel installations and roofing services throughout New Mexico, including the Santa Fe area.
SunState Solar offers a combined roofing and solar installation service, allowing homeowners to address both roof condition and solar panel installation in a single project. The company serves residential and commercial clients with customized solar designs, battery storage options, and ongoing system maintenance.
SunState Solar is a locally owned New Mexico company with a focus on quality workmanship and customer service across the greater Albuquerque and Santa Fe region.
Service Area
SunState Solar serves the following areas within a 62-mile radius:
Contact Information
Are you SunState Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
15 reviews
Verified Customer
SunState Solar completed a full roof replacement and solar installation on our Santa Fe home. Having one company handle both the roof and panels ensured everything was properly integrated.
Verified Customer
Good communication and fair pricing. The installation crew was professional and cleaned up thoroughly. Our system is generating as projected.
Verified Customer
We appreciated that SunState could inspect our roof condition before installing panels. They identified areas that needed attention and handled everything in one project.
Frequently Asked Questions About SunState Solar
What services does SunState Solar offer?
SunState Solar offers Solar Installation, Battery Storage, Maintenance.
Is SunState Solar NABCEP certified?
SunState Solar holds the following certifications: Licensed Contractor (NM). Contact them directly for the latest accreditation details.
What areas does SunState Solar serve?
SunState Solar serves Santa Fe, Albuquerque, Rio Rancho, Bernalillo. They are based in Santa Fe with a service radius of 100 km.
What warranty does SunState Solar offer?
SunState Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are SunState Solar's customer reviews?
SunState Solar has a 4.6/5 rating based on 15 customer reviews. Customers consistently rate them highly.
How long has SunState Solar been in business?
SunState Solar was founded in 2018 and has been in business for 8 years. They have solid experience in the solar industry.
Similar Installers in Santa Fe
Get a Free Solar Quote from SunState Solar
Fill in your details and we'll connect you with SunState Solar.
Quote request sent!
SunState Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile