Evolution Energy
Top-rated Downey-based solar installer with 1,500+ systems completed across Southern California since 2009
17+
Years in Business
1,500+
Projects Completed
82
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About Evolution Energy
Evolution Energy is a California-licensed electrical contractor specializing in solar electric systems, based at 9102 Firestone Boulevard in Downey. Founded in 2009, the company has installed more than 1,500 solar power systems across Southern California, earning a 5.0-star rating on EnergySage from 82 reviews. Evolution Energy holds California electrical contractor license #944493 and operates as an agile company that handles both small residential and large commercial-scale solar projects.
The company custom-designs each system in-house, using panels from Mission Solar and inverters from Enphase and Fronius. Battery storage options include the Tesla Powerwall. Evolution Energy manages every phase of the project internally, from site assessment and engineering through permitting, installation, and utility interconnection with LADWP or SCE.
Evolution Energy provides a 25-year workmanship warranty covering all installations and roof areas beneath the solar panels, alongside 25-year manufacturer warranties on panels and inverters. Customer reviews consistently highlight the company’s responsiveness, clean installations, and accurate production estimates. The team’s hands-on approach and local expertise in the Southeast LA area have made them a top-ranked installer on the EnergySage marketplace.
Service Area
Evolution Energy serves the following areas within a 50-mile radius:
Contact Information
Are you Evolution Energy?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
82 reviews
Alex R.
Evolution Energy designed and installed a 9 kW system on our Downey home. From the first consultation to final inspection, every step was handled professionally. Our electricity bill is now under $10 a month.
Maria G.
Alex and the team were outstanding. They responded quickly to every question, the installation crew was clean and efficient, and the system was up and running within three weeks of signing.
Steven L.
Excellent communication from start to finish. They helped us understand our energy usage, sized the system correctly, and the production numbers have matched their estimates perfectly.
Frequently Asked Questions About Evolution Energy
What services does Evolution Energy offer?
Evolution Energy offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Monitoring, Grid Connection.
Is Evolution Energy NABCEP certified?
Evolution Energy holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Evolution Energy serve?
Evolution Energy serves Los Angeles, Downey, Whittier, Norwalk, Cerritos, Long Beach, Lakewood, Compton and 2 other areas. They are based in Los Angeles with a service radius of 80 km.
What warranty does Evolution Energy offer?
Evolution Energy offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Evolution Energy's customer reviews?
Evolution Energy has a 5/5 rating based on 82 customer reviews. Customers consistently rate them highly.
How long has Evolution Energy been in business?
Evolution Energy was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Los Angeles
Get a Free Solar Quote from Evolution Energy
Fill in your details and we'll connect you with Evolution Energy.
Quote request sent!
Evolution Energy will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile