Synergy Solar
Jacksonville solar and roofing contractor with union-trained electricians and top 4% Florida contractor ranking
7+
Years in Business
25
Customer Reviews
75 mi
Service Area
1-10
Employees
SurgePV Score
About Synergy Solar
Synergy Solar is a Jacksonville-based solar and roofing contractor operating from 8595 103rd Street in Jacksonville. Founded in 2019, the company has built a strong reputation in Northeast Florida, earning a BuildZoom score of 111, which ranks in the top 4% of all Florida licensed contractors. Synergy Solar is BBB Accredited, GAF Certified for roofing, and holds certifications from the National Fire Protection Association, OSHA, Solar Energy International, and Enphase University.
The company’s electricians are union-trained through the International Brotherhood of Electrical Workers Local 177 and the Electrical Training Alliance. Synergy installs Qcells and Canadian Solar panels with Enphase microinverters and offers Enphase IQ and Tesla Powerwall battery storage. The combined solar and roofing capability allows the company to evaluate roof condition alongside solar potential, bundling both services when needed.
Synergy Solar holds a 4.8-star rating with customers consistently praising the team’s flexibility, patience, and direct coordination with utility companies. The company is affiliated with the National Electrical Contractors Association North Florida Chapter, the North Florida Green Chamber of Commerce, and the Florida Solar Energy Industries Association. Synergy serves Jacksonville and the greater North Florida region, with business hours Monday through Saturday.
Service Area
Synergy Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Synergy Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
25 reviews
George H.
Synergy went above and beyond with flexibility and patience throughout our project. They worked directly with the utility company on our behalf and the entire process was well managed.
Linda C.
Really impressed by the customer service. The combined solar and roofing expertise meant they could assess our roof condition and solar potential in a single visit. Installation was professional and clean.
Frank N.
Jonathan and the team were knowledgeable and responsive. The union-trained electricians did quality work. The only minor delay was with the city permit but Synergy kept us informed throughout.
Frequently Asked Questions About Synergy Solar
What services does Synergy Solar offer?
Synergy Solar offers Solar Installation, Battery Storage, Solar Design, Roof Assessment, Grid Connection, Maintenance.
Is Synergy Solar NABCEP certified?
Synergy Solar holds the following certifications: BBB Accredited, GAF Certified Roofing Contractor, NFPA Certified, OSHA Certified, Solar Energy International, Enphase University, IBEW Local 177. Contact them directly for the latest accreditation details.
What areas does Synergy Solar serve?
Synergy Solar serves Jacksonville, Orange Park, St. Augustine, Fernandina Beach, Jacksonville Beach, Ponte Vedra Beach, Middleburg. They are based in Jacksonville with a service radius of 120 km.
What warranty does Synergy Solar offer?
Synergy Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Synergy Solar's customer reviews?
Synergy Solar has a 4.8/5 rating based on 25 customer reviews. Customers consistently rate them highly.
How long has Synergy Solar been in business?
Synergy Solar was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Jacksonville
Get a Free Solar Quote from Synergy Solar
Fill in your details and we'll connect you with Synergy Solar.
Quote request sent!
Synergy Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile