TechFix Electric
NAPIT-certified electrical and solar installer serving Birmingham since 2009
17+
Years in Business
45
Customer Reviews
50 km
Service Area
SurgePV Score
About TechFix Electric
TechFix Electric is an electrical and solar installation company based at Apex House, 3 Embassy Drive in Birmingham. Founded in 2009 by Mike Thompson, the company has grown from a single-van operation into a NAPIT and MCS-certified business with over 15 years of experience and more than 2,500 completed jobs across the West Midlands.
The company offers both domestic and commercial solar PV installations alongside battery storage and EV charger fitting. TechFix’s background in general electrical work means their team handles the full scope of wiring, consumer unit upgrades, and grid connections in-house. All work is Part P certified and the MCS accreditation means customers can access the Smart Export Guarantee and 0% VAT on residential systems.
TechFix Electric serves Birmingham, West Bromwich, Solihull, Sutton Coldfield, and surrounding areas. Their approach focuses on honest pricing and straightforward advice, which has earned them positive reviews and repeat business across the region.
Service Area
TechFix Electric serves the following areas within a 50 km radius:
Contact Information
Are you TechFix Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Warranty Coverage
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
Building control sign-off and DNO notification
Go Live
System commissioning and handover
Customer Reviews
4.8
45 reviews
Birmingham Resident
Mike and his team did an excellent job installing our solar panels. They were punctual, professional, and left the property spotless. The system is generating more than we expected.
West Midlands Homeowner
Very impressed with the whole process. TechFix provided honest advice without any pressure selling. The installation was completed quickly and to a high standard.
Frequently Asked Questions About TechFix Electric
What services does TechFix Electric offer?
TechFix Electric offers Solar Installation, Battery Storage, EV Charging.
Is TechFix Electric MCS certified?
Yes, TechFix Electric is MCS certified and also holds NAPIT certification. MCS certification means they meet industry standards for solar panel installation in the UK.
What areas does TechFix Electric serve?
TechFix Electric serves Birmingham, West Bromwich, Solihull, Sutton Coldfield, Dudley. They are based in Birmingham with a service radius of 50 km.
What warranty does TechFix Electric offer?
TechFix Electric offers 25-year panel warranty, and 10-year installation/workmanship warranty.
How are TechFix Electric's customer reviews?
TechFix Electric has a 4.8/5 rating based on 45 customer reviews. Customers consistently rate them highly.
How long has TechFix Electric been in business?
TechFix Electric was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Birmingham
Get a Free Solar Quote from TechFix Electric
Fill in your details and we'll connect you with TechFix Electric.
Quote request sent!
TechFix Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile