TF

Technicians for Sustainability

Employee-owned Tucson solar installer with NABCEP accreditation and 59+ MW installed since 2003

Tucson, Arizona
4.9 (602 reviews)
Verified
Residential Commercial

23+

Years in Business

2,000+

Projects Completed

602

Customer Reviews

62 mi

Service Area

51-100

Employees

SurgePV Score

9 / 10
Customer Reviews
98%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About Technicians for Sustainability

Technicians for Sustainability, commonly known as TFS, is an employee-owned cooperative solar installation company founded in 2003 in Tucson, Arizona. Operating from 1050 E 19th Street, TFS has installed over 59 MW of solar capacity and brought hundreds of battery storage systems online for residential and commercial customers across Southern Arizona. The company is one of only a handful of solar installers nationwide to hold full NABCEP company accreditation.

TFS is a SunPower Elite Dealer and installs inverters from Enphase and SMA alongside Tesla Powerwall and Enphase IQ battery storage systems. The company also offers solar hot water installations, making it one of the more versatile renewable energy providers in the Tucson market. As an employee-owned cooperative, many TFS team members are also owners, which drives a culture of accountability and quality across every project.

With a 4.9-star rating from over 600 reviews, TFS is the highest-rated solar installer in Tucson by a significant margin. The company has helped over 2,000 customers make the switch to solar since opening its doors in 2003. Customers consistently praise the no-pressure consultative approach, technical competence, and thorough follow-up support. TFS offers 25-year manufacturer warranties on panels and inverters with a 10-year workmanship guarantee.

Service Area

Technicians for Sustainability serves the following areas within a 62-mile radius:

TucsonOro ValleyMaranaSahuaritaGreen ValleyVailCatalina

Are you Technicians for Sustainability?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring
Commercial Solar
solar_hot_water

Certifications & Accreditations

NABCEP Accredited Company SunPower Elite Dealer

Partner Manufacturers

Panels

SunPower

Inverters

EnphaseSMA

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.9

602 reviews

Rachel M.

5 November 2025
Verified Customer

TFS installed a 10 kW SunPower system with a Tesla Powerwall on our Tucson home. The employee-owned culture really comes through in how everyone on the team takes pride in their work. System is producing above estimates.

Andrew C.

20 July 2025
Verified Customer

We chose TFS for our commercial rooftop project because of their NABCEP accreditation and 20 years of experience. The 30 kW system was installed on schedule and the production numbers have been excellent.

Susan B.

12 March 2025
Verified Customer

Professional from the first phone call to the final inspection. TFS walked us through every option without any sales pressure. The Enphase monitoring system makes it easy to track daily production. Highly recommend.

Frequently Asked Questions About Technicians for Sustainability

What services does Technicians for Sustainability offer?

Technicians for Sustainability offers Solar Installation, Battery Storage, Maintenance, Monitoring, Commercial Solar, solar_hot_water.

Is Technicians for Sustainability NABCEP certified?

Technicians for Sustainability holds the following certifications: NABCEP Accredited Company, SunPower Elite Dealer. Contact them directly for the latest accreditation details.

What areas does Technicians for Sustainability serve?

Technicians for Sustainability serves Tucson, Oro Valley, Marana, Sahuarita, Green Valley, Vail, Catalina. They are based in Tucson with a service radius of 100 km.

What warranty does Technicians for Sustainability offer?

Technicians for Sustainability offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Technicians for Sustainability's customer reviews?

Technicians for Sustainability has a 4.9/5 rating based on 602 customer reviews. Customers consistently rate them highly.

How long has Technicians for Sustainability been in business?

Technicians for Sustainability was founded in 2003 and has been in business for 23 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Technicians for Sustainability

Fill in your details and we'll connect you with Technicians for Sustainability.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote