TS

The Solar Guys

Family-owned Kansas City solar installer since 2012 with Enphase Platinum Certified status and 25-year comprehensive warranty

Kansas City, Missouri
4.8 (150 reviews)
Verified
Residential

14+

Years in Business

0

150

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

9.4 / 10
Customer Reviews
96%
Certifications
90%
Experience
85%
Services Range
100%
Warranty Coverage
100%
Online Presence
100%

About The Solar Guys

The Solar Guys is a family-owned and operated solar installation company based in Parkville, Missouri, in the Kansas City metro area. Founded in 2012, the company has grown into one of the most recognized solar installers in the region, voted the number one solar company in the Kansas City area two years running. The Solar Guys holds NABCEP certification, SEIA membership, and Enphase Platinum Certified Installer status, reflecting a high volume of quality Enphase installations.

The company installs REC solar panels paired with Enphase microinverters and offers battery storage through the Enphase IQ platform. All installations come with a standard 25-year warranty covering panels, inverters, and workmanship. The Solar Guys handles every aspect of the process in-house, from system design and engineering through permitting, installation, and utility interconnection.

The Solar Guys operates from 6114 MO-9 in Parkville and primarily serves the Kansas City metro area across both Missouri and Kansas. The company also has a presence in the Des Moines, Iowa market. Free solar consultations are available, and the team provides detailed production estimates and financing guidance before installation begins.

Service Area

The Solar Guys serves the following areas within a 124-mile radius:

Kansas CityParkvilleLibertyGladstoneIndependenceLee's SummitBlue SpringsDes Moines

Are you The Solar Guys?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Energy Audit
Grid Connection
Monitoring

Certifications & Accreditations

NABCEP SEIA Member Enphase Platinum Certified

Partner Manufacturers

Panels

REC

Inverters

Enphase

Batteries

Enphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

150 reviews

Aaron S.

28 September 2025
Verified Customer

The Solar Guys lived up to their reputation. The crew was on time, professional, and finished our 8 kW system in a single day. The REC panels and Enphase microinverters are producing more than promised. Great local company.

Kimberly H.

14 June 2025
Verified Customer

We chose The Solar Guys because they are a local family business that takes pride in their work. The 25-year warranty on everything, panels, inverters, and workmanship, gave us confidence. Five months in and our electric bill is almost zero.

Derek P.

22 March 2025
Verified Customer

Good experience overall. The sales process was informative without being pushy. Installation was clean and the system has been reliable. Only minor note is that scheduling took about three weeks due to high demand.

Frequently Asked Questions About The Solar Guys

What services does The Solar Guys offer?

The Solar Guys offers Solar Installation, Battery Storage, Solar Design, Energy Audit, Grid Connection, Monitoring.

Is The Solar Guys NABCEP certified?

Yes, The Solar Guys is NABCEP certified and also holds SEIA Member, Enphase Platinum Certified certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does The Solar Guys serve?

The Solar Guys serves Kansas City, Parkville, Liberty, Gladstone, Independence, Lee's Summit, Blue Springs, Des Moines. They are based in Kansas City with a service radius of 200 km.

What warranty does The Solar Guys offer?

The Solar Guys offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.

How are The Solar Guys's customer reviews?

The Solar Guys has a 4.8/5 rating based on 150 customer reviews. Customers consistently rate them highly.

How long has The Solar Guys been in business?

The Solar Guys was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from The Solar Guys

Fill in your details and we'll connect you with The Solar Guys.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote