TS

The Solar Store

Tucson's longest-running solar company since 1998 with NABCEP-certified installers and a registered PE on staff

Tucson, Arizona
4 (37 reviews)
Verified
Residential Commercial

28+

Years in Business

0

37

Customer Reviews

62 mi

Service Area

11-50

Employees

SurgePV Score

8.9 / 10
Customer Reviews
80%
Certifications
90%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
75%

About The Solar Store

The Solar Store is Tucson’s longest-continuously-operating solar company, founded in 1998 and located at 2833 N Country Club Rd. The company has been BBB Accredited since its founding year and maintains an A+ rating. With over 60 years of combined team experience, The Solar Store provides solar photovoltaic, solar water heating, and solar pool heating installations for residential and commercial customers across Southern Arizona.

The company employs NABCEP-certified photovoltaic and solar thermal installers along with a registered professional engineer on staff, a distinction that few local solar companies can match. This engineering oversight ensures that every system design accounts for structural loads, electrical code compliance, and optimal performance. The Solar Store’s team undergoes at least 36 hours of annual training to stay current with evolving technology and building codes.

The Solar Store holds a 4.0-star average from 37 reviews on Yelp, with customers valuing the company’s technical depth and longevity in the market. The showroom at their Country Club Road location allows customers to see equipment in person before making decisions. The Solar Store offers 25-year manufacturer warranties on panels and inverters with a 10-year workmanship warranty, backed by more than a quarter century of continuous operation in Tucson.

Service Area

The Solar Store serves the following areas within a 62-mile radius:

TucsonOro ValleyMaranaSahuaritaGreen ValleyCatalinaVail

Are you The Solar Store?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring
solar_hot_water
solar_pool_heating

Certifications & Accreditations

NABCEP BBB A+ Accredited ROC Licensed

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4

37 reviews

Kenneth R.

28 September 2025
Verified Customer

The Solar Store has been in business for over 25 years and it shows. Kevin and his team designed a system that perfectly matches our energy usage. Their registered engineer reviewed everything before installation began.

Margaret T.

15 May 2025
Verified Customer

Reliable company with experienced staff. They installed both solar PV panels and a solar water heater on our home. The team was professional and the systems are performing well after six months.

Frank W.

8 February 2025
Verified Customer

Good local company with deep technical knowledge. The NABCEP-certified installer answered all our questions and the system was installed cleanly. Slightly longer wait for initial appointment than expected.

Frequently Asked Questions About The Solar Store

What services does The Solar Store offer?

The Solar Store offers Solar Installation, Battery Storage, Maintenance, Monitoring, solar_hot_water, solar_pool_heating.

Is The Solar Store NABCEP certified?

Yes, The Solar Store is NABCEP certified and also holds BBB A+ Accredited, ROC Licensed certifications. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does The Solar Store serve?

The Solar Store serves Tucson, Oro Valley, Marana, Sahuarita, Green Valley, Catalina, Vail. They are based in Tucson with a service radius of 100 km.

What warranty does The Solar Store offer?

The Solar Store offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are The Solar Store's customer reviews?

The Solar Store has a 4/5 rating based on 37 customer reviews. They are well-regarded by their customers.

How long has The Solar Store been in business?

The Solar Store was founded in 1998 and has been in business for 28 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from The Solar Store

Fill in your details and we'll connect you with The Solar Store.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote