TE

Tile Energy

Swindon's leading solar and battery storage installer — Tesla Premium Installer and SolarEdge expert with 10+ years experience

Swindon, UK
0 (4 reviews)
Verified
Residential Commercial

2026+

Years in Business

0

4

Customer Reviews

50 km

Service Area

11-50

Employees

SurgePV Score

5.7 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
90%
Warranty Coverage
63%
Online Presence
50%

About Tile Energy

Tile Energy is based at Unit 9 Bowman Court, Whitehill Industrial Estate, Royal Wootton Bassett, Swindon, SN4 7DB. With over 10 years of experience in solar PV installation, the company has established itself as one of Swindon and Wiltshire’s best-known solar and battery storage specialists.

Tile Energy is one of only 23 Tesla Premium Installers in the UK, meaning they are authorised to install and support Tesla Powerwall battery systems to the highest standard. The company also operates as a SolarEdge certified expert, installing SolarEdge power optimisers and inverters for maximum energy yield and monitoring. Tile Energy holds MCS accreditation and is a Which? Trusted Trader.

The company serves Swindon, Royal Wootton Bassett, Marlborough, Cirencester, Newbury, Hungerford, and Chippenham. Services include residential and commercial solar panel installation, Tesla Powerwall battery storage, and EV charging infrastructure. On Solar Guide and other review platforms, Tile Energy receives consistently positive feedback for professionalism, pricing, and installation quality.

Service Area

Tile Energy serves the following areas within a 50 km radius:

SwindonRoyal Wootton BassettMarlboroughCirencesterNewburyHungerfordChippenham

Are you Tile Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
EV Charging
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Inverters

SolarEdge

Batteries

Tesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

0

4 reviews

Verified Customer

15 September 2024
Verified Customer

The sales consultation felt like an expert two-way conversation and was not at all pushy. I was very impressed with the salesman's knowledge and the installation was arranged within two weeks at a very competitive price.

Verified Customer

20 July 2024
Verified Customer

Knowledgeable and professional staff with excellent communication throughout. The SolarEdge and Tesla Powerwall installation was completed efficiently and the results have exceeded our expectations.

Frequently Asked Questions About Tile Energy

What services does Tile Energy offer?

Tile Energy offers Solar Installation, Battery Storage, EV Charging, Maintenance.

Is Tile Energy MCS certified?

Yes, Tile Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does Tile Energy serve?

Tile Energy serves Swindon, Royal Wootton Bassett, Marlborough, Cirencester, Newbury, Hungerford, Chippenham. They are based in Swindon with a service radius of 50 km.

What warranty does Tile Energy offer?

Tile Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Tile Energy's customer reviews?

Tile Energy has a 0/5 rating based on 4 customer reviews. See individual reviews on this page for more detail.

How long has Tile Energy been in business?

Tile Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Tile Energy

Fill in your details and we'll connect you with Tile Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote