Today's Power
Arkansas solar developer providing utility-scale solar, battery storage, and EV charging since 2014
12+
Years in Business
124 mi
Service Area
11-50
Employees
SurgePV Score
About Today's Power
Today’s Power, Inc. is a solar energy developer headquartered at 7300 Industry Dr, North Little Rock, AR 72117. Founded in 2014 by Arkansas Electric Cooperatives, Inc., the company provides solar installations, battery energy storage systems, EV charging infrastructure, consulting, and operations and maintenance services.
Today’s Power plays an integral role in supplying renewable energy to electric cooperatives, the public power market, and commercial customers across Arkansas. The company is BBB accredited with an A+ rating (since 2019) and has partnered with organizations including North Little Rock Electric to develop multi-acre solar sites with thousands of panels.
Service Area
Today's Power serves the following areas within a 124-mile radius:
Contact Information
Are you Today's Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
No reviews yet.
Frequently Asked Questions About Today's Power
What services does Today's Power offer?
Today's Power offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is Today's Power NABCEP certified?
Today's Power holds the following certifications: BBB A+ Rated, BBB Accredited (since 2019). Contact them directly for the latest accreditation details.
What areas does Today's Power serve?
Today's Power serves Little Rock, North Little Rock, Conway, Pine Bluff, Hot Springs, Jonesboro. They are based in Little Rock with a service radius of 200 km.
What warranty does Today's Power offer?
Today's Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Today's Power's customer reviews?
Today's Power does not have any reviews yet. Be the first to leave a review after using their services.
How long has Today's Power been in business?
Today's Power was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.
Similar Installers in Little Rock
Get a Free Solar Quote from Today's Power
Fill in your details and we'll connect you with Today's Power.
Quote request sent!
Today's Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile