Touch Of Power Solutions
Charlotte-based electrical and solar contractor providing 24/7 service for residential and commercial solar installations
11+
Years in Business
30
Customer Reviews
50 mi
Service Area
2-10
Employees
SurgePV Score
About Touch Of Power Solutions
Touch Of Power Solutions is a Charlotte-based electrical and solar contractor located at 722 Montana Dr, Charlotte, NC 28216. The company provides solar panel installation for residential and commercial properties across Charlotte and the surrounding metro area. The team includes licensed electricians who handle both the electrical infrastructure and solar components of each project.
As a smaller, locally owned contractor, Touch Of Power Solutions offers a hands-on approach where customers work directly with the installation team throughout the project. The company handles system design, permitting, installation, and inspection coordination. Their electrical background means they can manage panel upgrades, rewiring, and other electrical work that larger solar-only companies would need to subcontract.
Touch Of Power Solutions maintains a 4.8-star rating across customer review platforms and is BBB accredited. The company offers a 24/7 service line for existing customers. Reviews consistently highlight competitive pricing compared to larger Charlotte solar installers and direct communication with the installation team. The company backs installations with manufacturer warranties on panels and inverters alongside a workmanship warranty.
Service Area
Touch Of Power Solutions serves the following areas within a 50-mile radius:
Contact Information
Are you Touch Of Power Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
5 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
30 reviews
Kevin P.
Touch Of Power did a great job on our solar install. The team was punctual, organized, and kept our yard clean throughout the project. Our 8 kW system is producing exactly what they estimated.
Maria G.
Small company that delivers big results. They were responsive to all our questions and the price was competitive with much larger firms. Having a local electrician handle the solar made us feel more comfortable.
Andre J.
Good installation and fair pricing. The team handled the electrical panel upgrade and solar in one visit. Only took off one star because scheduling the initial consultation took about two weeks.
Frequently Asked Questions About Touch Of Power Solutions
What services does Touch Of Power Solutions offer?
Touch Of Power Solutions offers Solar Installation, electrical_services, Solar Design.
Is Touch Of Power Solutions NABCEP certified?
Touch Of Power Solutions holds the following certifications: NC Licensed Electrical Contractor, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Touch Of Power Solutions serve?
Touch Of Power Solutions serves Charlotte, Concord, Huntersville, Matthews, Gastonia, Mint Hill. They are based in Charlotte with a service radius of 80 km.
What warranty does Touch Of Power Solutions offer?
Touch Of Power Solutions offers 25-year panel warranty, 25-year inverter warranty, and 5-year installation/workmanship warranty.
How are Touch Of Power Solutions's customer reviews?
Touch Of Power Solutions has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Touch Of Power Solutions been in business?
Touch Of Power Solutions was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Charlotte
Get a Free Solar Quote from Touch Of Power Solutions
Fill in your details and we'll connect you with Touch Of Power Solutions.
Quote request sent!
Touch Of Power Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile