TS

Trinity Solar

One of the largest residential solar installers in the Northeast with operations since 1994 and a Connecticut office in Cheshire

Hartford, Connecticut
4.5 (3200 reviews)
Verified
Residential

32+

Years in Business

100,000+

Projects Completed

3,200

Customer Reviews

75 mi

Service Area

1001-5000

Employees

SurgePV Score

8.6 / 10
Customer Reviews
90%
Certifications
75%
Experience
100%
Services Range
100%
Warranty Coverage
80%
Online Presence
50%

About Trinity Solar

Trinity Solar is one of the largest residential solar installers in the northeastern United States, with operations dating back to 1994. The company operates a Connecticut office at 7 McKee Place in Cheshire and serves homeowners throughout the greater Hartford area, New Haven County, and beyond. Trinity has completed over 100,000 solar installations across multiple states and employs thousands of people.

The company offers both solar panel installation and roofing services, allowing homeowners to bundle a new roof with their solar system when needed. Trinity installs panels from Qcells and Canadian Solar alongside Enphase and SolarEdge inverters, and provides battery storage through Tesla Powerwall and Enphase IQ Battery. Their NABCEP-certified teams manage every step of the installation process from design through activation.

Trinity Solar is BBB accredited and offers multiple financing options, including $0-down solar loans and lease arrangements. The company has dedicated customer service representatives who assist homeowners throughout the project lifecycle and beyond. Their scale allows them to offer competitive pricing while maintaining quality standards across all their installations.

Service Area

Trinity Solar serves the following areas within a 75-mile radius:

HartfordWest HartfordCheshireNew HavenWaterburyMeridenWallingfordHamden

Are you Trinity Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
roofing
Energy Audit
Grid Connection

Certifications & Accreditations

NABCEP BBB Accredited

Partner Manufacturers

Panels

QcellsCanadian Solar

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

3200 reviews

Ryan D.

18 October 2025
Verified Customer

Trinity Solar handled everything from our initial consultation to the final inspection. The process was well-organized and the crew finished in one day. Our system is producing more than the estimate.

Michelle K.

25 July 2025
Verified Customer

Large company but they gave us a personal touch. Our project manager was responsive and kept us updated throughout. The installation quality is excellent and we are seeing real savings on our electric bill.

Tony V.

12 April 2025
Verified Customer

Trinity delivered a clean, professional installation. The timeline was a bit longer than a smaller local company might offer, but the pricing was competitive and the equipment is top quality.

Frequently Asked Questions About Trinity Solar

What services does Trinity Solar offer?

Trinity Solar offers Solar Installation, Battery Storage, Solar Design, roofing, Energy Audit, Grid Connection.

Is Trinity Solar NABCEP certified?

Yes, Trinity Solar is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Trinity Solar serve?

Trinity Solar serves Hartford, West Hartford, Cheshire, New Haven, Waterbury, Meriden, Wallingford, Hamden. They are based in Hartford with a service radius of 120 km.

What warranty does Trinity Solar offer?

Trinity Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Trinity Solar's customer reviews?

Trinity Solar has a 4.5/5 rating based on 3200 customer reviews. Customers consistently rate them highly.

How long has Trinity Solar been in business?

Trinity Solar was founded in 1994 and has been in business for 32 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Trinity Solar

Fill in your details and we'll connect you with Trinity Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote