UE

U.S. Energy Solutions

Greenville-based energy company providing solar panels, battery storage, HVAC, and home efficiency upgrades

Greenville, South Carolina
4.5 (15 reviews)
Residential Commercial

14+

Years in Business

0

15

Customer Reviews

50 mi

Service Area

11-50

Employees

SurgePV Score

6.4 / 10
Customer Reviews
90%
Certifications
0%
Experience
85%
Services Range
60%
Warranty Coverage
80%
Online Presence
75%

About U.S. Energy Solutions

U.S. Energy Solutions is an energy services company with a Greenville office at 56 Pelham Davis Cir B, Greenville, SC 29615 and a head office at 3146 Wade Hampton Blvd, Taylors, SC 29687. The company provides a comprehensive range of energy products and services including solar panel installation, battery storage, high-efficiency HVAC systems, attic insulation, and LED lighting.

U.S. Energy Solutions takes a whole-home approach to energy efficiency, helping homeowners and businesses reduce their energy consumption through a combination of solar generation and efficiency upgrades. The company serves the Greenville metro area and surrounding Upstate communities.

U.S. Energy Solutions operates Monday through Friday, 8:00 AM to 5:00 PM, and provides free energy assessments for residential and commercial customers.

Service Area

U.S. Energy Solutions serves the following areas within a 50-mile radius:

GreenvilleTaylorsGreerSimpsonvilleSpartanburg

Are you U.S. Energy Solutions?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

15 reviews

Verified Customer

12 August 2025
Verified Customer

U.S. Energy Solutions handled our solar installation along with an HVAC upgrade. Having one company manage both saved us time and money. The solar system is performing great.

Verified Customer

8 June 2025
Verified Customer

Good company that offers more than just solar. They assessed our whole home energy use and recommended a complete package. The installation was professional.

Verified Customer

2 April 2025
Verified Customer

Very happy with the solar panel installation. The team was efficient and the system has been reducing our electricity bill significantly. Good value for the investment.

Frequently Asked Questions About U.S. Energy Solutions

What services does U.S. Energy Solutions offer?

U.S. Energy Solutions offers Solar Installation, Battery Storage.

Is U.S. Energy Solutions NABCEP certified?

U.S. Energy Solutions holds the following certifications: None listed. Contact them directly for the latest accreditation details.

What areas does U.S. Energy Solutions serve?

U.S. Energy Solutions serves Greenville, Taylors, Greer, Simpsonville, Spartanburg. They are based in Greenville with a service radius of 80 km.

What warranty does U.S. Energy Solutions offer?

U.S. Energy Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are U.S. Energy Solutions's customer reviews?

U.S. Energy Solutions has a 4.5/5 rating based on 15 customer reviews. Customers consistently rate them highly.

How long has U.S. Energy Solutions been in business?

U.S. Energy Solutions was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from U.S. Energy Solutions

Fill in your details and we'll connect you with U.S. Energy Solutions.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote