Watt Masters
Arizona's most experienced electrical and solar contractor with over 50,000 installations since 1999
27+
Years in Business
50,000+
Projects Completed
150
Customer Reviews
62 mi
Service Area
51-100
Employees
SurgePV Score
About Watt Masters
Watt Masters has been one of Arizona’s most experienced electrical and solar contractors since 1999, with over 50,000 completed installations across the Phoenix metropolitan area. The company started as an electrical contracting firm and expanded into solar energy, giving them deep expertise in both disciplines. Their long track record and high volume of projects make them one of the largest locally-operated solar installers in the state.
The company serves both residential and commercial customers, offering solar panel installation, battery backup systems, EV charger installation, and generator backup solutions. Watt Masters works with panels from REC, Q Cells, and Silfab, paired with Enphase and SolarEdge inverters. Battery options include Tesla Powerwall, Generac PWRcell, and Enphase IQ Battery. Their commercial solar division handles larger-scale rooftop and ground-mount projects for warehouses, office buildings, and retail locations.
Watt Masters holds a 4.6-star rating on Angi and a 4.9-star rating on Birdeye. The company is licensed, bonded, certified, and insured in Arizona, and maintains BBB accreditation. Customers frequently note the company’s upfront pricing, professional crews, and the advantage of working with electricians who understand both the solar and electrical sides of an installation. Their philosophy is that work done right the first time rarely requires warranty service.
Service Area
Watt Masters serves the following areas within a 62-mile radius:
Contact Information
Are you Watt Masters?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.6
150 reviews
Paul T.
Watt Masters installed our commercial solar system on our warehouse. The team handled all the permitting and utility coordination. System was up and running within six weeks. Highly recommend for business installations.
Sandra L.
We chose Watt Masters because of their 25 years of experience. The installation was fast and professional. They also installed a Generac backup battery for storm season. Very transparent pricing with no hidden costs.
Kevin A.
Good installation and fair pricing. The crew was courteous and cleaned up after themselves. System has been performing well for the past four months. Their experience in electrical work is a real advantage.
Frequently Asked Questions About Watt Masters
What services does Watt Masters offer?
Watt Masters offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring, Commercial Solar, Grid Connection.
Is Watt Masters NABCEP certified?
Yes, Watt Masters is NABCEP certified and also holds ROC Licensed, BBB Accredited certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Watt Masters serve?
Watt Masters serves Phoenix, Scottsdale, Tempe, Mesa, Chandler, Gilbert, Glendale, Peoria and 3 other areas. They are based in Phoenix with a service radius of 100 km.
What warranty does Watt Masters offer?
Watt Masters offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Watt Masters's customer reviews?
Watt Masters has a 4.6/5 rating based on 150 customer reviews. Customers consistently rate them highly.
How long has Watt Masters been in business?
Watt Masters was founded in 1999 and has been in business for 27 years. They are one of the more experienced solar installers in their area.
Similar Installers in Phoenix
Get a Free Solar Quote from Watt Masters
Fill in your details and we'll connect you with Watt Masters.
Quote request sent!
Watt Masters will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile