Wayne's Solar
A+ BBB rated solar contractor with 25+ years of experience serving Jacksonville and Northeast Florida
28+
Years in Business
30
Customer Reviews
75 mi
Service Area
1-10
Employees
SurgePV Score
About Wayne's Solar
Wayne’s Solar is an established solar contractor serving Jacksonville and Northeast Florida from 4108 Cordgrass Inlet Drive in Jacksonville. Founded in 1998, the company has over 25 years of experience installing solar electric panels, solar pool heating, and solar water heating systems for residential and commercial clients across Duval, St. Johns, Clay, Flagler, Seminole, and Putnam counties.
The company holds Florida Licensed Solar Contractor certification CVC56698, a BBB A+ rating, and Panasonic Elite Installer status. Wayne’s Solar earned the Angi Super Service Award in 2023. The company installs Panasonic and Qcells panels with Enphase and SolarEdge inverters, paired with Tesla Powerwall and Enphase IQ battery storage systems. Wayne’s Solar handles system design, engineering, permitting, installation, utility interconnection, and ongoing maintenance.
Wayne’s Solar holds an expert score of 4.8 out of 5 across multiple review platforms. Customers note the company’s deep local knowledge, quality workmanship, and reliable customer service built over decades of continuous operation. The company serves Jacksonville, Jacksonville Beach, St. Augustine, Ponte Vedra Beach, Fernandina Beach, Orange Park, and Palm Coast. Toll-free contact is available at 888-673-9720.
Service Area
Wayne's Solar serves the following areas within a 75-mile radius:
Contact Information
Are you Wayne's Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
30 reviews
Steven L.
Wayne's Solar has been around for over two decades and it shows in the quality of their work. The Panasonic panels look great on our roof and the system is producing above the estimates. Professional crew from start to finish.
Carol H.
We compared several Jacksonville solar companies and Wayne's Solar offered the best combination of experience, equipment quality, and pricing. The A+ BBB rating gave us extra confidence in choosing them.
Mark J.
Solid installation with quality equipment. Wayne's Solar handled all the permitting and utility paperwork. The only minor delay was the city inspection scheduling, but the team kept us informed throughout the process.
Frequently Asked Questions About Wayne's Solar
What services does Wayne's Solar offer?
Wayne's Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Grid Connection.
Is Wayne's Solar NABCEP certified?
Wayne's Solar holds the following certifications: BBB A+, Panasonic Elite Installer, Angi Super Service Award 2023, FL Licensed Solar Contractor CVC56698. Contact them directly for the latest accreditation details.
What areas does Wayne's Solar serve?
Wayne's Solar serves Jacksonville, Jacksonville Beach, St. Augustine, Ponte Vedra Beach, Fernandina Beach, Orange Park, Palm Coast. They are based in Jacksonville with a service radius of 120 km.
What warranty does Wayne's Solar offer?
Wayne's Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are Wayne's Solar's customer reviews?
Wayne's Solar has a 4.8/5 rating based on 30 customer reviews. Customers consistently rate them highly.
How long has Wayne's Solar been in business?
Wayne's Solar was founded in 1998 and has been in business for 28 years. They are one of the more experienced solar installers in their area.
Similar Installers in Jacksonville
Get a Free Solar Quote from Wayne's Solar
Fill in your details and we'll connect you with Wayne's Solar.
Quote request sent!
Wayne's Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile