WG

WDS Green Energy

MCS-certified heat pump and solar PV specialists with over 1,500 installations across South Wales and the South West

Swansea, UK
0 (0 reviews)
Verified
Residential Commercial

2026+

Years in Business

1,500+

Projects Completed

80 km

Service Area

11-50

Employees

SurgePV Score

5.2 / 10
Customer Reviews
0%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
25%

About WDS Green Energy

WDS Green Energy Ltd is a renewable energy company based in the Gower area of Swansea, SA3 1JE, serving customers across South Wales, the Midlands, and the South West of England. The company specialises in ground and air source heat pumps, underfloor heating, and solar PV systems, and has completed over 1,500 heat pump installations throughout their service area.

The company is MCS-accredited, and all system designs follow MCS guidelines, enabling customers to access government incentives including the Smart Export Guarantee. WDS Green Energy’s MCS-trained staff provide expert design consultancy for both heat pump and solar PV projects, with systems tailored to the specific needs of each property.

WDS Green Energy can be contacted by calling 02920 190 290. The company’s dedicated Swansea service page is available at wdsgreenenergy.co.uk/swansea. Their extensive track record in South Wales and multi-award-winning status in the renewable energy sector reflects a consistent record of technical expertise across residential and commercial projects.

Service Area

WDS Green Energy serves the following areas within a 80 km radius:

SwanseaGowerNeathCardiffMidlandsSouth West England

Are you WDS Green Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

MCS

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

Building control sign-off and DNO notification

5

Go Live

System commissioning and handover

Customer Reviews

No reviews yet.

Frequently Asked Questions About WDS Green Energy

What services does WDS Green Energy offer?

WDS Green Energy offers Solar Installation, Battery Storage, Maintenance.

Is WDS Green Energy MCS certified?

Yes, WDS Green Energy is MCS certified. MCS certification means they meet industry standards for solar panel installation in the UK.

What areas does WDS Green Energy serve?

WDS Green Energy serves Swansea, Gower, Neath, Cardiff, Midlands, South West England. They are based in Swansea with a service radius of 80 km.

What warranty does WDS Green Energy offer?

WDS Green Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are WDS Green Energy's customer reviews?

WDS Green Energy does not have any reviews yet. Be the first to leave a review after using their services.

How long has WDS Green Energy been in business?

WDS Green Energy was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from WDS Green Energy

Fill in your details and we'll connect you with WDS Green Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote