WR

Wolf River Electric

Midwest solar and electrical company serving Minneapolis with in-house installation teams since 2014

Minneapolis, Minnesota
4.5 (156 reviews)
Verified
Residential Commercial

12+

Years in Business

156

Customer Reviews

93 mi

Service Area

51-200

Employees

SurgePV Score

8.3 / 10
Customer Reviews
90%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
50%

About Wolf River Electric

Wolf River Electric is a full-service electrical and solar company headquartered in Isanti, Minnesota, serving the Minneapolis-Saint Paul metro area and the broader upper Midwest. Founded in 2014 as an LED lighting retrofitting company, Wolf River has grown into one of the region’s largest solar installers, providing residential and commercial solar, battery storage, EV charging, and electrical services across Minnesota, Wisconsin, Iowa, North Dakota, and South Dakota.

The company uses in-house installation teams rather than subcontractors, maintaining direct quality control over every project. Wolf River Electric installs REC and Silfab panels with Enphase and SolarEdge inverters and offers Tesla Powerwall and Enphase battery storage. The company also handles electrical panel upgrades and backup generator installations, providing comprehensive energy solutions beyond solar alone.

Wolf River Electric holds an A+ rating from the Better Business Bureau and has accumulated over 156 reviews across platforms with a 4.5-star average rating. The company’s electrical contracting background gives it an advantage over solar-only competitors when it comes to panel upgrades, wiring, and whole-home energy management. Customers appreciate the in-house crews and competitive pricing.

Service Area

Wolf River Electric serves the following areas within a 93-mile radius:

MinneapolisSaint PaulIsantiAnokaBlaineMaple GroveCottage GroveWoodbury

Are you Wolf River Electric?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
EV Charging
electrical_panel_upgrade
backup_generator

Certifications & Accreditations

NABCEP BBB A+ Accredited

Partner Manufacturers

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.5

156 reviews

Paul R.

8 October 2025
Verified Customer

Wolf River Electric installed our solar panels and a Tesla Powerwall battery. The in-house crew was professional and efficient. Our system has been running perfectly and the battery provides great peace of mind during outages.

Sarah N.

12 July 2025
Verified Customer

Competitive pricing and excellent installation quality. Luke on the sales team was very responsive and the installation crew completed everything in two days. Happy with the system performance so far.

Mike J.

5 April 2025
Verified Customer

Good installation and fair pricing. Communication during the project could have been more proactive, but the end result is solid. System has been producing well and the monitoring app works great.

Frequently Asked Questions About Wolf River Electric

What services does Wolf River Electric offer?

Wolf River Electric offers Solar Installation, Battery Storage, Solar Design, EV Charging, electrical_panel_upgrade, backup_generator.

Is Wolf River Electric NABCEP certified?

Yes, Wolf River Electric is NABCEP certified and also holds BBB A+ Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Wolf River Electric serve?

Wolf River Electric serves Minneapolis, Saint Paul, Isanti, Anoka, Blaine, Maple Grove, Cottage Grove, Woodbury. They are based in Minneapolis with a service radius of 150 km.

What warranty does Wolf River Electric offer?

Wolf River Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Wolf River Electric's customer reviews?

Wolf River Electric has a 4.5/5 rating based on 156 customer reviews. Customers consistently rate them highly.

How long has Wolf River Electric been in business?

Wolf River Electric was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Wolf River Electric

Fill in your details and we'll connect you with Wolf River Electric.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote