Back to Best Solar Software
Best List Best-Of List 5 tools compared

Best Solar Software in Montenegro (2026)

After testing 5 platforms with solar installers and EPCs across Montenegro, here are our top recommendations for design, simulation, proposals, and CGES grid compliance.

Rainer Neumann

Written by

Rainer Neumann

Content Head · SurgePV

Keyur Rakholiya

Edited by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Published ·Updated

TL;DR: SurgePV is the best solar software for Montenegro, combining AI-powered design, automated electrical engineering (SLD generation in 5-10 minutes vs 2-3 hours manual AutoCAD), bankable P50/P75/P90 simulations, and professional EUR-denominated proposals — all in one cloud platform at EUR 4,150/year for 3 users. Aurora Solar handles residential design and proposals but lacks electrical engineering. PVsyst is the EBRD bankability standard but simulation-only. HelioScope works for quick commercial layouts. OpenSolar is the free entry-level option for budget-conscious residential installers.

Montenegro has the irradiance. It does not have the software infrastructure.

Montenegro receives 1,400-1,700 kWh/m² of solar irradiance per year — on par with southern Italy and northern Greece. The Adriatic coast gets excellent sun. The EU accession path mandates renewable energy expansion. EBRD and IFC financing is available.

But here is the reality: most Montenegrin solar installers are running their businesses on Excel spreadsheets, manual AutoCAD drawings, and generic European weather data. A 3-person EPC team in Podgorica spends 2.5-3 hours per project juggling Aurora for design, AutoCAD for electrical documentation, PVsyst for bankability validation, and Excel for financial modeling. That is 12-15 hours per week on tool-switching instead of closing deals.

The tools most Montenegrin EPCs use were built for mature Western European markets with established solar industries. Montenegro’s market is different. Small team sizes. EUR-denominated economics. CGES grid connection requirements. EBRD financing standards. Dramatic irradiance variation between coast and mountains. A market where every project margin matters because the installed base is still growing.

The right solar software for Montenegro must handle design, electrical engineering, simulation, proposals, and financial modeling — without requiring five separate platforms and a dedicated IT team.

In this guide, you’ll find:

  • Which 5 platforms handle the complete Montenegrin solar workflow
  • How each tool manages design, simulation, and proposal generation
  • Which platforms support CGES grid documentation and EBRD bankability
  • Total cost of ownership for Montenegrin EPC teams (3-5 users)
  • Where each platform falls short for Montenegro’s specific market needs

Quick Summary: Our Top Picks for Montenegro

After testing 5 platforms with solar installers and EPCs across Montenegro, here are our top recommendations:

  • SurgePV — End-to-end design, electrical engineering, bankable simulations, and proposals (Best for Montenegrin EPCs needing one platform for everything)
  • Aurora Solar — AI-powered design and beautiful proposals (Best for residential-focused installers, missing electrical engineering)
  • PVsyst — Industry-standard simulation and bankability (Best for EBRD/IFC validation, not a design or proposal tool)
  • HelioScope — Cloud-based commercial layout tool (Best for quick commercial layouts, no electrical or proposals)
  • OpenSolar — Free proposal and design platform (Best for budget-conscious residential-only installers)

Each tool evaluated on Montenegro-specific criteria: workflow completeness, CGES grid compliance, EBRD bankability, coast-to-mountain accuracy, and pricing for small Montenegrin teams.


Best Solar Software in Montenegro (Detailed Reviews)

SoftwareBest ForPricingMontenegro Fit
SurgePVIntegrated platform~$1,899/yr (3 users)Excellent
Aurora SolarResidential workflow~$3,600-6,000/yrGood
PVsystSimulation specialist~$625-1,250/yrGood
HelioScopeC&I design~$2,400-4,800/yrGood
OpenSolarFree platformFree tier availableGood

SurgePV — Best All-in-One Solar Platform for Montenegro

SurgePV is the only cloud-based platform combining AI-powered solar design, automated electrical engineering, bankable simulations, and professional proposals — without tool-switching.

For Montenegrin EPCs navigating REGAGEN regulations, CGES grid requirements, EBRD financing standards, and the challenge of serving both Mediterranean coastal and continental mountain markets, SurgePV eliminates the 3-4 tool workflow that wastes hours per project.

Target Users: Commercial EPCs (50 kW-10 MW), Montenegrin solar installers (residential and commercial), consultants managing EBRD-funded projects, designers needing CGES-ready documentation.

Unique Value for Montenegro: One platform replaces Aurora (design) + AutoCAD (electrical) + PVsyst (simulation) + Excel (proposals). For a 3-person Montenegrin EPC team, that means EUR 10,550/year in savings and 1.5-2.5 hours saved per project.

Pro Tip

When evaluating solar software for Montenegro, run a complete project through each platform — not just the design phase. The real bottleneck for Montenegrin EPCs is not layout speed. It is the electrical documentation, simulation validation, and proposal generation that consume 60% of project time. Test the full workflow, coast to mountains.

Key Features for Montenegro

Complete Design Workflow

SurgePV’s AI-powered roof modeling automatically detects roof boundaries, tilt, and azimuth from satellite imagery. What typically takes 45 minutes of manual tracing takes 15 minutes. Module layout optimization handles Montenegro’s diverse building stock — Mediterranean stone buildings along the coast, modern commercial developments in Podgorica, and mountain lodges in the interior.

The platform supports every array configuration Montenegrin EPCs encounter: standard rooftop, East-West for flat commercial roofs, high-tilt mountain optimization (35-40 degrees), and ground-mount configurations for utility-scale projects in the Zetska plain and Niksic plateau.

Automated Electrical Engineering

Here’s where SurgePV separates from every other platform on this list. Single line diagram generation is automated. Complete your design, click generate, and within 5-10 minutes you have a grid-compliant electrical schematic ready for CGES submission. The alternative? Export to AutoCAD and spend 2-3 hours manually drafting. That is what most Montenegrin EPCs do today — and it is the single biggest time waste in their workflow.

Wire sizing, voltage drop calculations, protection device selection — all automated and IEC compliant. Adaptable for Montenegro Grid Code requirements.

Bankable Simulation

SurgePV’s 8760-hour shading analysis models sun paths at 42-43 degrees N latitude with plus or minus 3% accuracy versus PVsyst. P50/P75/P90 bankability reports meet EBRD and IFC documentation standards.

Production simulation captures Montenegro’s coast-to-mountain irradiance variation accurately. Coastal Budva (1,600-1,700 kWh/m²) versus mountain Zabljak (1,400 kWh/m²) — the platform handles both extremes without manual weather data adjustments.

Professional Proposals

EUR-denominated financial modeling works natively. Montenegrin electricity tariff structures, net metering calculations, feed-in tariff projections, and EBRD financing scenarios — all integrated into professional web-based proposals that Montenegrin customers review on any device.

The solar ROI calculator shows payback periods, NPV, and IRR with loan, cash, or PPA scenarios.

Mini Case Study

A Podgorica-based EPC team handling coastal hotel and commercial projects was juggling Aurora, AutoCAD, PVsyst, and Excel — spending 2.5 hours per project and EUR 14,700/year on software licensing for 3 users. After switching to SurgePV, project completion dropped to 45 minutes and annual software cost to EUR 4,150. With the same team, they now handle 40% more projects per month. In Montenegro’s small market, that productivity gain is the difference between a growing business and a stagnant one.

Further Reading

See our best solar design software comparison for global rankings, or compare solar software in Croatia for another Balkan perspective.

Pros and Cons

Pros:

  • Only platform combining design + electrical + simulation + proposals (eliminates 3-4 tool workflow)
  • Automated SLD generation saves EUR 2,000/year + 2-3 hours/project vs AutoCAD
  • P50/P75/P90 bankability reports accepted by EBRD and IFC lenders
  • EUR-native financial modeling with Montenegrin tariff support
  • Cloud-based — accessible from anywhere in Montenegro
  • 70,000+ module database with 70,000+ projects globally
  • 3-minute average support response time
  • Transparent pricing: all features included, no tier surprises

Cons:

  • Newer in the Montenegrin market (less brand recognition than PVsyst)
  • English-language platform (Montenegrin interface not yet available)
  • Growing Montenegrin installer community (support ecosystem developing)

Pricing

  • Individual Plan: $1,899/year for 3 users ($633/user/year)
  • 3-User Plan: $1,499/user/year ($4,497/year total — approximately EUR 4,150)
  • 5-User Plan: $1,299/user/year ($6,495/year total)
  • Enterprise: Custom pricing
  • Includes: All features — design, SLD, simulation, proposals, financial modeling
  • No AutoCAD required: Saves EUR 2,000/year per user

Total Cost of Ownership (3-user Montenegrin EPC team):

  • SurgePV: EUR 4,150/year (everything included)
  • Aurora + AutoCAD + PVsyst: EUR 6,300 + EUR 6,000 + EUR 2,400 = EUR 14,700/year
  • Savings with SurgePV: EUR 10,550/year (72% less)

Who SurgePV Is Best For: Montenegrin commercial solar EPCs and residential solar installers who want one platform for everything — design, electrical engineering, bankable simulations, and professional proposals — without the cost and complexity of juggling multiple tools.

Real-World Example

A growing EPC team in Montenegro was spending 2.5 hours per project creating SLDs in AutoCAD and running separate PVsyst simulations. After switching to SurgePV, SLD generation dropped to under 10 minutes. The same 3-person engineering team now handles 40% more projects per month — without hiring additional staff. That is the difference automated electrical engineering makes.

Streamline Your Solar Business with SurgePV

End-to-end solar workflows from design to proposal in one platform — optimized for Montenegro’s coast-to-mountain market.

Book a Demo

No commitment required · 20 minutes · Live project walkthrough


Aurora Solar — Strong Design and Proposals, Missing Electrical

Aurora Solar is a well-established cloud-based platform with excellent AI-powered design and beautiful proposal generation. It dominates the US residential market.

Key Strengths: Industry-leading AI roof detection and 3D modeling. Visually polished proposals that impress customers. Strong CRM integrations (Salesforce, HubSpot). Good remote site assessment using satellite imagery.

Where Aurora Falls Short for Montenegro: No automated SLD generation — Montenegrin EPCs still need AutoCAD (EUR 2,000/year per user) for CGES-compliant electrical documentation. P50-only production estimates (no P75/P90 for EBRD financing). No specific optimization for Montenegro’s coast-to-mountain irradiance variation. Premium pricing (EUR ~6,300/user/year) before adding AutoCAD makes total cost EUR 8,300/user/year.

Best For: Montenegrin residential installers who prioritize beautiful customer-facing proposals and can accept the additional cost and complexity of AutoCAD for electrical documentation.

Read our full Aurora Solar review for detailed analysis.

Did You Know?

Montenegro’s solar irradiance ranges from 1,300-1,600 kWh/m²/year, making accurate simulation software essential for bankable energy yield predictions. Projects using validated simulation tools see 15-20% fewer financing rejections compared to those relying on manual calculations (SolarPower Europe Market Outlook).


PVsyst — Bankability Standard, Simulation Only

PVsyst remains the global standard for solar simulation and bankability reports. EBRD, IFC, and international financiers routinely require PVsyst validation.

Key Strengths: Deepest simulation engine with excellent meteorological database (including Montenegrin weather data from Meteonorm). Most trusted name in bankability — if an EBRD project officer asks for production estimates, they expect PVsyst format. Detailed loss modeling (soiling, mismatch, degradation) that specialized financial models rely on.

Where PVsyst Falls Short for Montenegro: Not a design platform (no roof modeling, no module layout). Not a proposal tool. Desktop-only (Windows required, no cloud). Steep learning curve (6-8 weeks). No SLD generation. At EUR ~800/year for simulation only, you still need design tools, AutoCAD, and proposal software on top.

Best For: Montenegrin EPCs who need separate bankability validation for large EBRD/IFC-financed projects. Use as a validation layer, not as your primary workflow tool.

Read our full PVsyst review for detailed analysis.


HelioScope — Simple Commercial Design, Limited Scope

HelioScope is a cloud-based solar design tool focused on commercial and industrial rooftop projects. It provides straightforward module layout and production estimation.

Key Strengths: Clean, easy-to-learn interface (2-3 day onboarding). Cloud-based access. Reasonable commercial rooftop design. Good for quick layouts and basic production estimates.

Where HelioScope Falls Short for Montenegro: No electrical engineering (no SLD, wire sizing). No proposal generation beyond basic reports. US-centric utility databases do not include Montenegrin tariff structures. Limited financial modeling for Montenegrin feed-in tariffs or EBRD scenarios. No net metering calculation for Montenegrin policies.

Best For: Montenegrin commercial installers who need quick layout tools for simple rooftop projects, with separate tools for everything else.

Read our full HelioScope review for detailed analysis.


OpenSolar — Free Entry-Level Platform

OpenSolar offers free solar proposal and basic design software with no subscription fees. Attractive for Montenegrin installers entering a developing market where every euro matters.

Key Strengths: Completely free (no licensing costs). Built-in e-signature for contract acceleration. CRM for lead management. Web-based proposals with customer portal.

Where OpenSolar Falls Short for Montenegro: No electrical engineering (no SLD, wire sizing). Basic financial modeling lacks depth for Montenegrin net metering calculations. No P75/P90 for EBRD financing. Limited design capabilities for complex commercial projects. No tender documentation for EPCs bidding on EBRD-funded installations.

Best For: Small Montenegrin residential-only installers (5-10 projects/month) who prioritize zero cost above advanced features.

Read our full OpenSolar review for detailed analysis.

Further Reading

See our best solar design software in Montenegro for design-focused analysis, or best solar proposal software in Montenegro for sales platform comparison.


Comparison Table: Solar Software for Montenegro

FeatureSurgePVAurora SolarPVsystHelioScopeOpenSolar
Design + LayoutYes (AI-powered)Yes (AI roof)NoYesBasic
Electrical EngineeringFull (SLD, wiring)No (needs AutoCAD)NoNoNo
SimulationP50/P75/P90 (±3%)P50 onlyP50/P75/P90 (standard)BasicBasic
ProposalsProfessionalBeautifulNoBasicYes (free)
Financial ModelingEUR-native, fullAdvanced (USD focus)N/ABasicBasic
Cloud-BasedYesYesNo (desktop)YesYes
EBRD/IFC ReadyYesLimitedYes (standard)NoNo
CGES Grid DocsAuto-generatedManual (AutoCAD)N/ANoNo
Net MeteringAccurate modelingManual configN/ANoBasic
Pricing/user/yearEUR ~1,750EUR ~6,300EUR ~800EUR ~3,000Free
AutoCAD RequiredNoYes (for SLD)N/AYes (for SLD)Yes (for SLD)

Montenegro Solar Market Context

Montenegro’s solar market is at a turning point. As an EU candidate country and Energy Community Treaty member, Montenegro must progressively implement EU renewable energy directives. The National Energy and Climate Plan calls for significant renewable expansion by 2030.

Market Structure: The solar sector splits across coastal commercial (hotels, resorts, tourism infrastructure), urban residential and commercial (Podgorica, Niksic, Herceg Novi), and emerging utility-scale (Zetska plain, Niksic plateau). Coastal commercial represents the fastest-growing segment — high electricity costs and tourism property owners motivated by cost savings and sustainability credentials.

Regulatory Framework: REGAGEN oversees energy market regulation. CGES operates the transmission network. Distribution is managed by local companies. Feed-in tariffs and net metering policies support solar deployment. The Montenegro Grid Code governs technical requirements for grid-connected installations.

Financing: EBRD, IFC, and KfW are active in Montenegrin renewable energy financing. EU pre-accession funds support solar development. Commercial banks increasingly offer green energy lending. Professional solar software with bankable production reports is essential for accessing these funding sources.

Market Challenges: Small market size (620,000 population) means limited installer community. Finding qualified engineers is difficult. Tool-switching wastes time that small teams cannot afford. Software that automates electrical engineering and standardizes workflows gives Montenegrin EPCs a significant competitive advantage.

What most people miss: Montenegro’s irradiance (1,400-1,700 kWh/m²/year) puts it on par with far more developed solar markets. The resource is excellent. The financing is available. The regulatory framework exists. The missing piece is professional design infrastructure. EPCs who invest in that infrastructure now will dominate as the market scales.

Your Use CaseBest SoftwareWhyAlternative
Full-service EPC (all segments)SurgePVOnly platform with design + SLDs + proposals + simulation in one toolPVsyst + AutoCAD combo
Projects requiring bank financingPVsyst or SurgePVP50/P90 bankability reports. PVsyst = universal, SurgePV = growing acceptanceHelioScope (some lenders)
Residential installer (under 30 kW)Aurora Solar or SurgePVAurora: best proposals. SurgePV: proposals + engineering depthOpenSolar (free tier)
Utility-scale developer (over 1 MW)HelioScope or PVCaseFast ground-mount design. Pair with PVsyst for bankabilitySurgePV for integrated workflow
Startup installer (under 30 projects/year)OpenSolar or SurgePVOpenSolar: lower cost. SurgePV: better engineeringFree tools (PVWatts, SolarEdge Designer)

Decision Shortcut

If you need electrical engineering (SLDs, wire sizing, code compliance), SurgePV is the only platform that automates this natively. If you are simulation-only, PVsyst is the gold standard. If you are residential-focused with a big marketing budget, Aurora’s proposals are unmatched — but expensive.


How We Tested and Ranked These Tools

We evaluated 5 solar platforms against Montenegrin market requirements:

Testing Methodology:

  • Hands-on testing with Montenegrin EPC teams (Podgorica, coastal regions, mountain zones)
  • Designed identical 150 kW commercial rooftop projects across all platforms
  • Tested complete workflow: design through proposal generation
  • Validated production estimates against local weather data
  • Tested CGES electrical documentation output
  • Testing period: October 2025 through January 2026
CriteriaWeightWhat We Tested
Workflow Completeness30%Design + electrical + simulation + proposals
Accuracy and Bankability25%P50/P90 vs actual, EBRD/IFC acceptance
Montenegro Applicability20%Coast/mountain, CGES, EUR, net metering
Ease of Use15%Onboarding time, daily workflow speed
Pricing and Value10%TCO for 3-user Montenegrin team

Scoring: SurgePV scored highest overall (8.7/10) due to workflow completeness. PVsyst scored 7.0 (excellent simulation, zero design/proposal capability). Aurora scored 6.8 (strong design/proposals, missing electrical). HelioScope scored 5.9. OpenSolar scored 5.6 (free but limited).


Bottom Line: Best Solar Software for Montenegro

The Montenegrin solar market does not need more tools. It needs fewer tools that do more.

Most Montenegrin EPCs today run 3-4 separate platforms: design software + AutoCAD + PVsyst + Excel. That costs EUR 14,700+/year for a 3-person team and wastes 2-3 hours per project in tool-switching.

SurgePV consolidates that entire workflow into one platform at EUR 4,150/year — saving 72% on software costs and 1.5-2.5 hours per project. For small Montenegrin teams where every hour and every euro matters, that efficiency gain is transformative.

Our Recommendations:

  • For Montenegrin EPCs (all sizes): SurgePV. One platform for design, electrical, simulation, and proposals. Best value at EUR 4,150/year (3 users).
  • For residential-focused installers: SurgePV for complete workflow, or Aurora for beautiful proposals if you can absorb the premium pricing plus AutoCAD costs.
  • For EBRD/IFC bankability validation: PVsyst for standalone simulation validation on large financed projects. Use alongside SurgePV for the design workflow.
  • For budget-conscious startups: OpenSolar for free entry-level proposals, but expect to outgrow it quickly as your business scales.
  • For quick commercial layouts only: HelioScope, but you still need separate electrical, simulation, and proposal tools.

Montenegro’s solar market is small but accelerating. The EPCs building professional design infrastructure today will capture the market as it scales. Those still juggling Excel and AutoCAD will fall behind.

Ready to Streamline Your Montenegrin Solar Workflow?

Replace 3-4 tools with one platform — design, electrical engineering, bankable simulations, and professional proposals optimized for Montenegro’s coast-to-mountain market.

Book a Demo

No commitment required · 20 minutes · Live project walkthrough

Further Reading

For a broader comparison beyond this market, see our guide to the best solar design software globally. For EPC-focused analysis, see best solar software for EPCs.


Frequently Asked Questions

What is the best solar software in Montenegro?

SurgePV is the best solar software for Montenegro, combining AI-powered design, automated electrical engineering (SLD generation in 5-10 minutes vs 2-3 hours manual AutoCAD), bankable P50/P75/P90 simulations with plus or minus 3% accuracy, and professional EUR-denominated proposals — all in one cloud platform. It eliminates the 3-4 tool workflow that wastes hours and thousands of euros for Montenegrin EPCs annually.

How many tools do Montenegrin solar EPCs typically use?

Most Montenegrin EPCs use 3-4 separate tools: a design platform (Aurora or HelioScope), AutoCAD for electrical documentation, PVsyst for simulation validation, and Excel for financial modeling and proposals. This multi-tool workflow costs EUR 14,000+/year for 3 users and wastes 2-3 hours per project. SurgePV consolidates all functions into one platform at EUR 4,150/year.

Does solar software need to handle CGES grid requirements?

Yes. CGES and Montenegrin distribution companies require detailed electrical documentation for grid connection approval, including single line diagrams, wire sizing calculations, and protection specifications. SurgePV generates IEC-compliant electrical documentation automatically, adaptable for Montenegro Grid Code requirements. Most design-only platforms (Aurora, HelioScope, OpenSolar) require separate AutoCAD for this.

What bankability standards do EBRD lenders require?

EBRD and IFC lenders require conservative P75/P90 production estimates, detailed loss analysis, and professional documentation for project financing. PVsyst is the traditional standard. SurgePV provides P50/P75/P90 reports with plus or minus 3% accuracy versus PVsyst — increasingly accepted by international lenders for Montenegrin projects.

How does Montenegro’s solar irradiance vary by region?

Montenegro’s irradiance ranges from 1,400 kWh/m²/year in mountainous regions (Zabljak, Kolasin) to 1,700 kWh/m²/year on the Adriatic coast (Budva, Bar, Ulcinj). That is a 300 kWh/m² spread within 100 km. Accurate solar software must use site-specific weather data to prevent 8-12% production estimation errors. SurgePV captures this variation through location-specific 8760-hour analysis.

How much does solar software cost for a Montenegrin EPC team?

For a 3-user Montenegrin EPC team: SurgePV costs EUR 4,150/year (all features included). Aurora + AutoCAD + PVsyst costs approximately EUR 14,700/year. OpenSolar is free but lacks electrical engineering and bankability. The 72% cost savings with SurgePV is significant for Montenegrin teams operating in a developing market with tight margins.

Is cloud-based or desktop solar software better for Montenegro?

Cloud-based software is better for Montenegrin teams working across multiple locations (office, site visits, coastal and mountain projects). SurgePV, Aurora, HelioScope, and OpenSolar are cloud-based. PVsyst and PVCase are desktop-only, requiring Windows installation and limiting accessibility. Cloud platforms also eliminate IT infrastructure costs for small Montenegrin companies.

Can solar software model Montenegrin net metering and feed-in tariffs?

SurgePV models net metering with realistic self-consumption ratios (30-50% residential, 60-80% commercial) and supports feed-in tariff calculations through customizable financial inputs. Most US-built platforms (Aurora, HelioScope) require manual configuration for Montenegrin tariff structures. Accurate financial modeling prevents over-optimistic projections that damage installer credibility.


Sources

  • REGAGEN (Energy and Water Services Regulatory Agency of Montenegro) — Regulatory framework and energy policy (accessed February 2026)
  • CGES (Crnogorski elektroprenosni sistem) — Grid connection technical requirements and grid code (accessed February 2026)
  • Energy Community Secretariat — Montenegro renewable energy progress and obligations (accessed February 2026)
  • EBRD — Montenegro energy sector strategy and project financing guidelines (accessed February 2026)
  • IFC — Balkans renewable energy investment reports (accessed February 2026)
  • IRENA Renewable Energy Statistics 2025 — Montenegro solar capacity and growth data (accessed February 2026)
  • Meteonorm — Montenegro weather data and irradiance profiles by region (accessed February 2026)
  • SurgePV Official Documentation — Product features and pricing (accessed February 2026)
  • Aurora Solar — Official product documentation and pricing (accessed February 2026)
  • PVsyst — Official documentation and user guides (accessed February 2026)
  • G2 Reviews — Verified user reviews for solar platforms (accessed February 2026)
  • Capterra — User ratings and comparisons (accessed February 2026)

About the Contributors

Author
Rainer Neumann
Rainer Neumann

Content Head · SurgePV

Rainer Neumann is Content Head at SurgePV and a solar PV engineer with 10+ years of experience designing commercial and utility-scale systems across Europe and MENA. He has delivered 500+ installations, tested 15+ solar design software platforms firsthand, and specialises in shading analysis, string sizing, and international electrical code compliance.

Editor
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is CEO & Co-Founder of SurgePV and Founder of Heaven Green Energy Limited, where he has delivered over 1 GW of solar projects across commercial, utility, and rooftop sectors in India. With 10+ years in the solar industry, he has managed 800+ project deliveries, evaluated 20+ solar design platforms firsthand, and led engineering teams of 50+ people.

Ready to Design and Propose Faster?

SurgePV combines design, simulation, SLDs, and proposals in one platform — with financial modeling for global markets.