1 Source Solar
Turnkey solar EPC firm serving Iowa homeowners, businesses, and farmers with NABCEP-certified installers since 2015
11+
Years in Business
83
Customer Reviews
99 mi
Service Area
11-50
Employees
SurgePV Score
About 1 Source Solar
1 Source Solar is a turnkey solar EPC firm headquartered at 3020 SW Oralabor Road, Suite 116 in Ankeny, Iowa, within the Des Moines metropolitan area. Founded in 2015, the company manages every stage of solar installation from engineering and procurement through construction for homeowners, businesses, farmers, and municipalities across Iowa and the Midwest.
The company employs NABCEP-certified solar installers and brings in-house engineering expertise to every project. 1 Source Solar provides complimentary site analysis, custom solar design, and system monitoring services. The team handles all permitting and utility interconnection paperwork on behalf of customers.
1 Source Solar holds an A+ rating with the Better Business Bureau and has accumulated over 80 customer reviews. The company serves the greater Des Moines metro, including Ankeny, Ames, West Des Moines, and communities throughout central Iowa.
Service Area
1 Source Solar serves the following areas within a 99-mile radius:
Contact Information
Are you 1 Source Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
83 reviews
Brian S.
1 Source Solar managed the entire process from site analysis to final inspection. Their NABCEP-certified team was professional and the system is producing exactly as promised.
Laura P.
Great experience from start to finish. They handled all the paperwork and permitting, and the installation crew was efficient and respectful of our property.
Mark H.
Good communication throughout the project. The solar design they provided maximized our roof space and the system has been performing well since day one.
Frequently Asked Questions About 1 Source Solar
What services does 1 Source Solar offer?
1 Source Solar offers Solar Installation, Solar Design, Maintenance, Monitoring.
Is 1 Source Solar NABCEP certified?
Yes, 1 Source Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does 1 Source Solar serve?
1 Source Solar serves Des Moines, Ankeny, Ames, West Des Moines, Urbandale, Johnston, Marshalltown. They are based in Des Moines with a service radius of 160 km.
What warranty does 1 Source Solar offer?
1 Source Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are 1 Source Solar's customer reviews?
1 Source Solar has a 4.7/5 rating based on 83 customer reviews. Customers consistently rate them highly.
How long has 1 Source Solar been in business?
1 Source Solar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Des Moines
Get a Free Solar Quote from 1 Source Solar
Fill in your details and we'll connect you with 1 Source Solar.
Quote request sent!
1 Source Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile