CB Solar
Engineering-led solar contractor delivering turnkey residential, commercial, and agricultural systems across Iowa since 2013
13+
Years in Business
550+
Projects Completed
45
Customer Reviews
99 mi
Service Area
11-50
Employees
SurgePV Score
About CB Solar
CB Solar is a Des Moines-based solar energy contractor founded in 2013 by engineering graduates of Iowa State University. Located at 5425 Lower Beaver Road, the company has designed and installed over 550 solar energy projects totaling more than 16 MW across Iowa. CB Solar holds NABCEP certification and employs a master electrician and two engineers on staff.
The company has been recognized as a Top Solar Contractor by Solar Power World magazine every year since 2014. CB Solar provides turnkey solar solutions for residential, commercial, and agricultural customers, managing every stage from initial site assessment and system design through permitting, installation, and interconnection.
CB Solar serves the greater Des Moines metro area and communities throughout Iowa, offering ground-mount and rooftop systems for homes, businesses, and farms. The company handles all engineering, procurement, and construction in-house.
Service Area
CB Solar serves the following areas within a 99-mile radius:
Contact Information
Are you CB Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
45 reviews
David K.
Professional and thorough from start to finish. CB Solar handled everything from design through installation and our system is performing above expectations.
Jennifer M.
As Iowa State engineering grads themselves, the CB Solar team really understood our technical questions. Great customer service and quality workmanship.
Tom R.
Solid installation on our farm property. The team was knowledgeable and completed the project on schedule. System has been running smoothly for months.
Frequently Asked Questions About CB Solar
What services does CB Solar offer?
CB Solar offers Solar Installation, Solar Design, Maintenance, Monitoring.
Is CB Solar NABCEP certified?
Yes, CB Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does CB Solar serve?
CB Solar serves Des Moines, West Des Moines, Ankeny, Ames, Urbandale, Johnston. They are based in Des Moines with a service radius of 160 km.
What warranty does CB Solar offer?
CB Solar offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are CB Solar's customer reviews?
CB Solar has a 4.8/5 rating based on 45 customer reviews. Customers consistently rate them highly.
How long has CB Solar been in business?
CB Solar was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.
Similar Installers in Des Moines
Get a Free Solar Quote from CB Solar
Fill in your details and we'll connect you with CB Solar.
Quote request sent!
CB Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile