Purelight Power
Top-rated residential solar installer in Des Moines with a streamlined zero-out-of-pocket switching program
7+
Years in Business
767
Customer Reviews
75 mi
Service Area
51-200
Employees
SurgePV Score
About Purelight Power
Purelight Power is a residential solar installation company with an Iowa office at 4673 121st Street in Urbandale, within the Des Moines metropolitan area. Established in 2019, the company has grown rapidly and now holds a 4.9-star rating from over 760 customer reviews, making it one of the highest-rated solar installers in the Des Moines market.
The company specializes in residential solar panel installations and offers a zero-out-of-pocket switching program designed to make the transition to solar accessible for homeowners. Purelight Power handles the full process from consultation and custom system design through permitting, installation, and utility interconnection.
Purelight Power serves homeowners throughout the Des Moines metro area, including Urbandale, Ankeny, West Des Moines, Johnston, and Cedar Rapids. The company holds a BBB A rating and is accredited since 2019.
Service Area
Purelight Power serves the following areas within a 75-mile radius:
Contact Information
Are you Purelight Power?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.9
767 reviews
Michelle T.
Purelight made the switch to solar incredibly easy. The installation team was professional and completed everything in one day. Very happy with the results.
James C.
Smooth process from the initial consultation to system activation. The team handled all the permitting and paperwork. Our electric bill has dropped to nearly zero.
Sarah K.
Good installation experience overall. The system is performing well and producing the energy they estimated. Communication was solid during the process.
Frequently Asked Questions About Purelight Power
What services does Purelight Power offer?
Purelight Power offers Solar Installation, Solar Design, Battery Storage, Monitoring.
Is Purelight Power NABCEP certified?
Purelight Power holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does Purelight Power serve?
Purelight Power serves Des Moines, Urbandale, Ankeny, West Des Moines, Cedar Rapids, Johnston. They are based in Des Moines with a service radius of 120 km.
What warranty does Purelight Power offer?
Purelight Power offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Purelight Power's customer reviews?
Purelight Power has a 4.9/5 rating based on 767 customer reviews. Customers consistently rate them highly.
How long has Purelight Power been in business?
Purelight Power was founded in 2019 and has been in business for 7 years. They have solid experience in the solar industry.
Similar Installers in Des Moines
Get a Free Solar Quote from Purelight Power
Fill in your details and we'll connect you with Purelight Power.
Quote request sent!
Purelight Power will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile