1 Sun Solar Electric
Las Vegas commercial and residential solar installer specializing in solar PV and LED lighting since 2007
19+
Years in Business
18
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About 1 Sun Solar Electric
1 Sun Solar Electric is a Las Vegas-based solar installation company founded in 2007 as a Nevada corporation. Located at 2708 S Highland Dr in Las Vegas, the company specializes in both commercial and residential solar installations, as well as commercial LED lighting solutions.
With over 17 years in business, 1 Sun Solar Electric has built a reputation for quality installations and reliable after-sale service. The company holds a Nevada contractor’s license and provides system design, permitting, installation, and maintenance for solar PV systems across the Las Vegas Valley.
1 Sun Solar Electric serves Las Vegas, Henderson, North Las Vegas, and Boulder City. The company operates Monday through Friday from 8 AM to 5 PM and provides free consultations for both residential and commercial solar projects.
Service Area
1 Sun Solar Electric serves the following areas within a 50-mile radius:
Contact Information
Are you 1 Sun Solar Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
12 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.2
18 reviews
William D.
Great install and great service after the sale. 1 Sun Solar Electric knows commercial solar inside and out. The system has performed above expectations.
Sarah M.
Professional team that handled our residential installation efficiently. The system was up and running within the quoted timeframe.
John R.
Chose 1 Sun Solar for their commercial LED and solar expertise. They designed a system that significantly reduced our business energy costs.
Frequently Asked Questions About 1 Sun Solar Electric
What services does 1 Sun Solar Electric offer?
1 Sun Solar Electric offers Solar Installation, Solar Design, Maintenance.
Is 1 Sun Solar Electric NABCEP certified?
1 Sun Solar Electric holds the following certifications: NV Contractor License. Contact them directly for the latest accreditation details.
What areas does 1 Sun Solar Electric serve?
1 Sun Solar Electric serves Las Vegas, Henderson, North Las Vegas, Boulder City. They are based in Las Vegas with a service radius of 80 km.
What warranty does 1 Sun Solar Electric offer?
1 Sun Solar Electric offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.
How are 1 Sun Solar Electric's customer reviews?
1 Sun Solar Electric has a 4.2/5 rating based on 18 customer reviews. They are well-regarded by their customers.
How long has 1 Sun Solar Electric been in business?
1 Sun Solar Electric was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Las Vegas
Get a Free Solar Quote from 1 Sun Solar Electric
Fill in your details and we'll connect you with 1 Sun Solar Electric.
Quote request sent!
1 Sun Solar Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile