5S

512 Solar

Austin's locally owned solar specialist designing beautiful, enduring installations for discerning homeowners since 2014

Austin, Texas
5 (450 reviews)
Verified
Residential Commercial

12+

Years in Business

0

450

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

8 / 10
Customer Reviews
100%
Certifications
60%
Experience
85%
Services Range
100%
Warranty Coverage
80%
Online Presence
25%

About 512 Solar

512 Solar is a locally owned and operated solar installation company based in Austin, Texas. Founded in 2014, the company specializes in residential and commercial solar PV design and installation, with a focus on creating aesthetically pleasing, high-performance systems for discerning homeowners. The company also installs EV charging stations, including the Tesla Wall Connector, and provides roof inspection, repair, and installation services.

The company installs Tier 1 solar equipment from manufacturers including REC, Silfab, and Qcells, paired with inverters from Enphase and SolarEdge. 512 Solar also provides maintenance and optimization services for existing solar systems, regardless of the original inverter brand, covering Enphase, SolarEdge, SMA, PowerOne, and Fronius equipment. This breadth of service capability makes them a strong choice for homeowners with older systems that need upgrades or troubleshooting.

512 Solar holds an outstanding 5.0-star average rating across more than 450 reviews on Birdeye and other platforms, making it one of the highest-rated solar companies in the Austin metro area. Customers consistently praise the company’s professionalism, competitive pricing, and quality of installation work. The EcoWatch rating of 5.0 out of 5 identifies 512 Solar as the best local installer in Austin.

Service Area

512 Solar serves the following areas within a 50-mile radius:

AustinLakewayBee CaveWestlake HillsDripping SpringsCedar ParkRound RockPflugervilleGeorgetown

Are you 512 Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
Monitoring
Solar Design
EV Charging
Roof Assessment

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

RECSilfabQcells

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

450 reviews

Tom B.

30 August 2025
Verified Customer

512 Solar is the real deal. JP and his team designed a system that maximized our roof space and the installation was flawless. We are producing more energy than we use most months.

Megan S.

8 June 2025
Verified Customer

We got quotes from five different companies and 512 Solar was the most thorough in explaining the design and equipment options. The crew finished our install in one day and left everything spotless.

Greg A.

14 March 2025
Verified Customer

Excellent local company. They handled our EV charger installation at the same time as the solar panels, which saved us time and money. The Tesla Wall Connector works perfectly with our system.

Frequently Asked Questions About 512 Solar

What services does 512 Solar offer?

512 Solar offers Solar Installation, Maintenance, Monitoring, Solar Design, EV Charging, Roof Assessment.

Is 512 Solar NABCEP certified?

Yes, 512 Solar is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does 512 Solar serve?

512 Solar serves Austin, Lakeway, Bee Cave, Westlake Hills, Dripping Springs, Cedar Park, Round Rock, Pflugerville and 1 other areas. They are based in Austin with a service radius of 80 km.

What warranty does 512 Solar offer?

512 Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are 512 Solar's customer reviews?

512 Solar has a 5/5 rating based on 450 customer reviews. Customers consistently rate them highly.

How long has 512 Solar been in business?

512 Solar was founded in 2014 and has been in business for 12 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from 512 Solar

Fill in your details and we'll connect you with 512 Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote