Elias Solar
NABCEP Board Certified Houston solar installer founded by Stanford and Texas A&M engineers
10+
Years in Business
5
Customer Reviews
50 mi
Service Area
1-10
Employees
SurgePV Score
About Elias Solar
Elias Solar is a Houston-based solar installation company founded in 2016 and headquartered at 3403 W T C Jester Blvd, Suite 1119, Houston, TX 77018. The company was started by engineers with backgrounds from Texas A&M University (Ph.D. in electrical engineering) and Stanford University (M.S. in mechanical engineering), bringing deep technical expertise to every installation.
Elias Solar is NABCEP Board Certified and holds an A+ BBB rating with accreditation since 2016. The company is a full-service EPC provider, performing all work in-house without subcontractors, from marketing and sales through installation, inspection, maintenance, and repair. They are not tied to any single brand and allow customers to choose solar panels, inverters, batteries, and racking systems that best fit their needs.
The company holds a 5.0-star rating across review platforms. Elias Solar serves residential, commercial, and utility-scale clients across the Greater Houston area with a 25-year workmanship warranty on all installations.
Service Area
Elias Solar serves the following areas within a 50-mile radius:
Contact Information
Are you Elias Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
5 reviews
Verified Customer
Elias Solar provided an exceptional installation experience. The engineering background of the founders was evident in the system design quality. Highly technical and professional.
Verified Customer
Outstanding work by the Elias Solar team. Everything was handled in-house from design to inspection. No subcontractors, no surprises. The system performs exactly as promised.
Verified Customer
Very knowledgeable technicians who took the time to explain the entire system. Appreciated the engineering expertise and attention to detail during installation.
Frequently Asked Questions About Elias Solar
What services does Elias Solar offer?
Elias Solar offers Solar Installation, Battery Storage, Maintenance.
Is Elias Solar NABCEP certified?
Elias Solar holds the following certifications: NABCEP Board Certified, BBB A+, Texas Electrician License (36539). Contact them directly for the latest accreditation details.
What areas does Elias Solar serve?
Elias Solar serves Houston, Katy, Sugar Land, The Woodlands, Pearland, Spring. They are based in Houston with a service radius of 80 km.
What warranty does Elias Solar offer?
Elias Solar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are Elias Solar's customer reviews?
Elias Solar has a 5/5 rating based on 5 customer reviews. Customers consistently rate them highly.
How long has Elias Solar been in business?
Elias Solar was founded in 2016 and has been in business for 10 years. They are one of the more experienced solar installers in their area.
Similar Installers in Houston
Get a Free Solar Quote from Elias Solar
Fill in your details and we'll connect you with Elias Solar.
Quote request sent!
Elias Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile