AE

Atma Energy

2026 EnergySage Local Installer of the Year for Texas with a perfect 5.0-star rating

San Antonio, Texas
5 (37 reviews)
Verified
Residential Commercial

6+

Years in Business

0

37

Customer Reviews

99 mi

Service Area

11-50

Employees

SurgePV Score

8 / 10
Customer Reviews
100%
Certifications
75%
Experience
70%
Services Range
100%
Warranty Coverage
80%
Online Presence
25%

About Atma Energy

Atma Energy is a technology-forward solar installation company founded in 2020 and headquartered in San Antonio, serving the Austin and San Antonio metro areas. Despite being a newer entrant to the market, the company has quickly established itself as one of the top-rated installers in the state, earning the 2026 EnergySage Local Installer of the Year award for Texas. Co-founders Supratim and Jaro built Atma Energy with a focus on customized, tech-enabled energy solutions that go beyond standard solar panel installation.

The company offers bundled energy services including solar PV systems, battery storage subscriptions, and electricity rate plan optimization. Atma Energy is an Enphase Platinum Installer, the highest tier in Enphase’s installer program, and became San Antonio’s only local company to hold that certification. The team installs panels from Qcells, REC, and Silfab paired with Enphase microinverters and IQ battery storage systems.

Atma Energy maintains a perfect 5.0-star rating across 37 reviews on EnergySage, with customers consistently praising the company’s responsiveness, transparent pricing, and quality of installations. The company serves the Austin, San Antonio, Houston, and Dallas metro areas, providing residential and commercial solar installations with a whole-home energy independence approach.

Service Area

Atma Energy serves the following areas within a 99-mile radius:

AustinSan AntonioHoustonDallasRound RockCedar ParkGeorgetownPflugerville

Are you Atma Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Energy Audit
Solar Design
Monitoring
Grid Connection

Certifications & Accreditations

Enphase Platinum Installer SEIA Member

Partner Manufacturers

Panels

QcellsRECSilfab

Inverters

Enphase

Batteries

Enphase IQ BatteryTesla Powerwall

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

37 reviews

Patrick N.

1 October 2025
Verified Customer

Atma Energy was exceptional from start to finish. The team walked us through every step, from system design to financing to installation. Our panels are producing exactly what they promised.

Lisa M.

22 July 2025
Verified Customer

Best solar experience in Austin. The Atma team was responsive, transparent on pricing, and finished the installation in one day. We are already seeing significant savings on our electric bill.

Ryan G.

15 May 2025
Verified Customer

We chose Atma Energy based on their Enphase Platinum certification and perfect reviews. They did not disappoint. The whole-home energy approach was exactly what we needed.

Frequently Asked Questions About Atma Energy

What services does Atma Energy offer?

Atma Energy offers Solar Installation, Battery Storage, Energy Audit, Solar Design, Monitoring, Grid Connection.

Is Atma Energy NABCEP certified?

Atma Energy holds the following certifications: Enphase Platinum Installer, SEIA Member. Contact them directly for the latest accreditation details.

What areas does Atma Energy serve?

Atma Energy serves Austin, San Antonio, Houston, Dallas, Round Rock, Cedar Park, Georgetown, Pflugerville. They are based in San Antonio with a service radius of 160 km.

What warranty does Atma Energy offer?

Atma Energy offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Atma Energy's customer reviews?

Atma Energy has a 5/5 rating based on 37 customer reviews. Customers consistently rate them highly.

How long has Atma Energy been in business?

Atma Energy was founded in 2020 and has been in business for 6 years. They have solid experience in the solar industry.

Get a Free Solar Quote from Atma Energy

Fill in your details and we'll connect you with Atma Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote