8MSolar
Award-winning NC solar installer with NABCEP-certified team — 2025 and 2026 EnergySage Local Installer of the Year
11+
Years in Business
205
Customer Reviews
75 mi
Service Area
11-50
Employees
SurgePV Score
About 8MSolar
8MSolar is a Durham-based solar installation company founded in 2015 and headquartered at 4502 Bennett Memorial Rd, Durham, NC 27705, with additional offices in Raleigh and Cary. The company is the number one residential, commercial, government, and nonprofit solar installer in North Carolina for 2025, and was named EnergySage Local Installer of the Year for NC in both 2025 and 2026.
8MSolar holds NABCEP certification, an Unlimited General Contractors license, and is a certified installer for Enphase, Tesla Powerwall, SolarEdge, REC, and Qcells. The company received the North Carolina Sustainable Energy Association Business of the Year award in 2024. They install panels from REC, Qcells, and SunPower alongside inverters from Enphase and SolarEdge, with battery options including Tesla Powerwall, Enphase IQ, Generac PWRcell, and Fortress Power.
On EnergySage, 8MSolar holds a 5.0-star rating from over 200 reviews. The company offers a lifetime warranty on solar panel systems for North Carolina residents, covering panels, inverters, and workmanship for 25 years.
Service Area
8MSolar serves the following areas within a 75-mile radius:
Contact Information
Are you 8MSolar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
25 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
205 reviews
Verified Customer
8MSolar made the entire process seamless from consultation to installation. The NABCEP-certified team designed a system that exceeded our production expectations.
Verified Customer
Excellent communication throughout the project. The crew was professional and the system has been performing above projections since day one.
Verified Customer
Best solar experience in the Triangle. They handled permitting, installation, and interconnection without any issues. Highly recommend.
Frequently Asked Questions About 8MSolar
What services does 8MSolar offer?
8MSolar offers Solar Installation, Battery Storage, EV Charging, Maintenance.
Is 8MSolar NABCEP certified?
8MSolar holds the following certifications: NABCEP Certified, BBB A+, Enphase Certified Installer, Tesla Powerwall Certified, SolarEdge Preferred Partner. Contact them directly for the latest accreditation details.
What areas does 8MSolar serve?
8MSolar serves Durham, Raleigh, Cary, Chapel Hill, Wake Forest. They are based in Durham with a service radius of 120 km.
What warranty does 8MSolar offer?
8MSolar offers 25-year panel warranty, 25-year inverter warranty, and 25-year installation/workmanship warranty.
How are 8MSolar's customer reviews?
8MSolar has a 4.7/5 rating based on 205 customer reviews. Customers consistently rate them highly.
How long has 8MSolar been in business?
8MSolar was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.
Similar Installers in Durham
Get a Free Solar Quote from 8MSolar
Fill in your details and we'll connect you with 8MSolar.
Quote request sent!
8MSolar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile