NC Solar Now
North Carolina's trusted solar installer since 2009 — NABCEP certified with expertise in all major brands
17+
Years in Business
26
Customer Reviews
93 mi
Service Area
11-50
Employees
SurgePV Score
About NC Solar Now
NC Solar Now is a Raleigh-based solar installer founded in 2009 and located at 2517 Atlantic Ave, Raleigh, NC 27604. The company serves Durham, Raleigh, Chapel Hill, and communities across North Carolina with residential and commercial solar installations, battery storage, EV charging, and system maintenance.
NC Solar Now staff holds NABCEP certification along with NC General Contracting License #69583, NC Electrical Contractors License #33569-U, and VA AES Electrical License #2705189061. The company is certified by all major solar brands including Tesla, Enphase, Franklin, Fortress, SolarEdge, Fronius, REC, Qcells, Silfab, Jinko, IronRidge, and Unirac.
On EnergySage, NC Solar Now holds a 5.0-star rating from 26 reviews. The company provides comprehensive maintenance and support services including panel repair, inverter troubleshooting, critter guard installation, system upgrades, and load monitoring. They recommend Qcells panels for their black-on-black curb appeal.
Service Area
NC Solar Now serves the following areas within a 93-mile radius:
Contact Information
Are you NC Solar Now?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
5
26 reviews
Verified Customer
NC Solar Now recommended Qcells panels for the best curb appeal on our home. The black-on-black design looks great and the system is performing well.
Verified Customer
Their NABCEP-certified team handled everything from permits to interconnection. Excellent communication throughout the entire process.
Verified Customer
Had them install solar panels and a Tesla Powerwall. The battery backup has already proven its worth during a power outage.
Frequently Asked Questions About NC Solar Now
What services does NC Solar Now offer?
NC Solar Now offers Solar Installation, Battery Storage, EV Charging, Maintenance, Monitoring.
Is NC Solar Now NABCEP certified?
NC Solar Now holds the following certifications: NABCEP Certified, NC General Contracting License, NC Electrical Contractors License, VA AES Electrical License. Contact them directly for the latest accreditation details.
What areas does NC Solar Now serve?
NC Solar Now serves Durham, Raleigh, Cary, Chapel Hill, Wake Forest. They are based in Durham with a service radius of 150 km.
What warranty does NC Solar Now offer?
NC Solar Now offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are NC Solar Now's customer reviews?
NC Solar Now has a 5/5 rating based on 26 customer reviews. Customers consistently rate them highly.
How long has NC Solar Now been in business?
NC Solar Now was founded in 2009 and has been in business for 17 years. They are one of the more experienced solar installers in their area.
Similar Installers in Durham
Get a Free Solar Quote from NC Solar Now
Fill in your details and we'll connect you with NC Solar Now.
Quote request sent!
NC Solar Now will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile