AS

Action Solar & Electric

Full-service solar installer in Chapel Hill serving the Triangle since 2015 — NABCEP PV Installation Professional

Durham, North Carolina
5 (10 reviews)
Verified
Residential Commercial

11+

Years in Business

0

10

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

8.6 / 10
Customer Reviews
100%
Certifications
100%
Experience
85%
Services Range
75%
Warranty Coverage
80%
Online Presence
50%

About Action Solar & Electric

Action Solar & Electric is a full-service solar installation company based at 204 Deer Ridge Drive, Chapel Hill, NC 27516. Founded in 2015, the company brings over 15 years of electrical contracting experience and serves Durham, Chapel Hill, Raleigh, and the broader Triangle region with residential and commercial solar design and installation.

The company holds NABCEP PV Installation Professional certification, OSHA 10 certification, Master Electrician credentials, and is a Licensed Electrical Contractor in North Carolina (License #31399-U). Action Solar is also a Certified AllEarth Solar Tracker Dealer and Installer, offering dual-axis solar trackers that can generate up to 45 percent more power than fixed systems.

Action Solar & Electric provides full-service solar from design through permitting, installation, and inspection for homes, businesses, municipal buildings, and nonprofits across the Triangle.

Service Area

Action Solar & Electric serves the following areas within a 50-mile radius:

DurhamChapel HillRaleighCaryHillsborough

Are you Action Solar & Electric?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

NABCEP PV Installation Professional OSHA 10 Certified Master Electrician Licensed Electrical Contractor NC

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

10 reviews

Verified Customer

15 August 2025
Verified Customer

Action Solar designed and installed our residential system with great attention to detail. Their NABCEP certification and master electrician credentials gave us confidence.

Verified Customer

28 May 2025
Verified Customer

Professional team that handled our commercial solar project from design to commissioning. Clean workmanship and excellent communication.

Verified Customer

10 March 2025
Verified Customer

Responsive, knowledgeable, and fair pricing. They completed our installation on time and the system is producing as expected.

Frequently Asked Questions About Action Solar & Electric

What services does Action Solar & Electric offer?

Action Solar & Electric offers Solar Installation, Battery Storage, Maintenance.

Is Action Solar & Electric NABCEP certified?

Action Solar & Electric holds the following certifications: NABCEP PV Installation Professional, OSHA 10 Certified, Master Electrician, Licensed Electrical Contractor NC. Contact them directly for the latest accreditation details.

What areas does Action Solar & Electric serve?

Action Solar & Electric serves Durham, Chapel Hill, Raleigh, Cary, Hillsborough. They are based in Durham with a service radius of 80 km.

What warranty does Action Solar & Electric offer?

Action Solar & Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Action Solar & Electric's customer reviews?

Action Solar & Electric has a 5/5 rating based on 10 customer reviews. Customers consistently rate them highly.

How long has Action Solar & Electric been in business?

Action Solar & Electric was founded in 2015 and has been in business for 11 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Action Solar & Electric

Fill in your details and we'll connect you with Action Solar & Electric.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote