AS

A&R Solar

Washington and Oregon's trusted solar company with over 17 years of experience serving the Puget Sound region

Tacoma, Washington
4.8 (50 reviews)
Verified
Residential Commercial

19+

Years in Business

0

50

Customer Reviews

62 mi

Service Area

51-100

Employees

SurgePV Score

9.1 / 10
Customer Reviews
96%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
80%
Online Presence
100%

About A&R Solar

A&R Solar is one of the Pacific Northwest’s most established solar companies, headquartered at 3211 Martin Luther King Jr Way S, Seattle, WA 98144, with service coverage spanning the entire Puget Sound region including Tacoma. Founded in 2007, the company is both NABCEP-certified and B Corp-certified, reflecting its commitment to quality installations and social responsibility.

A&R Solar serves residential and commercial customers across Washington and Oregon, installing solar panels, battery storage systems, and providing ongoing maintenance and monitoring services. The company partners with leading equipment manufacturers including Enphase and Tesla.

A&R Solar has built a strong reputation over 17+ years in the industry, with consistent high ratings from customers praising the company’s technical expertise, transparent pricing, and professional installation crews.

Service Area

A&R Solar serves the following areas within a 62-mile radius:

TacomaSeattleOlympiaBellevuePortland

Are you A&R Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance
Monitoring

Certifications & Accreditations

NABCEP Certified B Corp Certified

Partner Manufacturers

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.8

50 reviews

Verified Customer

15 August 2025
Verified Customer

A&R Solar designed and installed a perfect system for our Tacoma home. Their team was professional from the first consultation through final inspection. The B Corp certification shows they care about doing things right.

Verified Customer

20 June 2025
Verified Customer

Outstanding experience. A&R Solar has been in business for years and it shows in their expertise. The installation was clean, efficient, and the system is performing exactly as projected.

Verified Customer

10 April 2025
Verified Customer

Great company with a strong reputation. The design team optimized our panel layout and the installation crew was skilled and professional. Happy with the end result.

Frequently Asked Questions About A&R Solar

What services does A&R Solar offer?

A&R Solar offers Solar Installation, Battery Storage, Maintenance, Monitoring.

Is A&R Solar NABCEP certified?

A&R Solar holds the following certifications: NABCEP Certified, B Corp Certified. Contact them directly for the latest accreditation details.

What areas does A&R Solar serve?

A&R Solar serves Tacoma, Seattle, Olympia, Bellevue, Portland. They are based in Tacoma with a service radius of 100 km.

What warranty does A&R Solar offer?

A&R Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are A&R Solar's customer reviews?

A&R Solar has a 4.8/5 rating based on 50 customer reviews. Customers consistently rate them highly.

How long has A&R Solar been in business?

A&R Solar was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from A&R Solar

Fill in your details and we'll connect you with A&R Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote