ACE LLC Solar
Tennessee Valley solar contractor specializing in behind-the-meter solar installations with battery backup for residential, commercial, and industrial clients
2026+
Years in Business
5
Customer Reviews
93 mi
Service Area
1-10
Employees
SurgePV Score
About ACE LLC Solar
ACE LLC Solar is an energy contracting company based in Pulaski, TN, serving the Tennessee Valley region including Huntsville and North Alabama. The company specializes in parallel and behind-the-meter solar connections with battery backup systems for residential, commercial, and industrial clients.
ACE LLC Solar has demonstrated experience in the Huntsville market, including a solar system installation for the Huntsville Medical Mall. The company provides comprehensive solar energy solutions including system design, installation, and maintenance for a wide range of property types across the Tennessee Valley.
ACE LLC Solar serves clients throughout North Alabama and Southern Tennessee, providing solar energy, construction services, and solar irrigation solutions for agricultural operations.
Service Area
ACE LLC Solar serves the following areas within a 93-mile radius:
Contact Information
Are you ACE LLC Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.5
5 reviews
Verified Customer
ACE LLC Solar installed a solar system with battery backup at our Huntsville property. They specialize in behind-the-meter connections and the system works exactly as designed.
Verified Customer
Good experience with ACE Solar for our commercial installation. They serve the Tennessee Valley region well and understood our local utility requirements.
Verified Customer
ACE LLC Solar handled our industrial solar project in Huntsville professionally. Their expertise in behind-the-meter systems with battery backup was exactly what we needed.
Frequently Asked Questions About ACE LLC Solar
What services does ACE LLC Solar offer?
ACE LLC Solar offers Solar Installation, Battery Storage, Solar Design, Maintenance, Grid Connection.
Is ACE LLC Solar NABCEP certified?
ACE LLC Solar holds the following certifications: None listed. Contact them directly for the latest accreditation details.
What areas does ACE LLC Solar serve?
ACE LLC Solar serves Huntsville, Pulaski, Athens, Decatur, Florence, Fayetteville. They are based in Huntsville with a service radius of 150 km.
What warranty does ACE LLC Solar offer?
ACE LLC Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are ACE LLC Solar's customer reviews?
ACE LLC Solar has a 4.5/5 rating based on 5 customer reviews. Customers consistently rate them highly.
How long has ACE LLC Solar been in business?
ACE LLC Solar was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Huntsville
Get a Free Solar Quote from ACE LLC Solar
Fill in your details and we'll connect you with ACE LLC Solar.
Quote request sent!
ACE LLC Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile