RE

Renewable Energy Design Group

Leading solar contractor in NC and SC since 2012 — residential, commercial, and agricultural solar installations

Durham, North Carolina
5 (7 reviews)
Verified
Residential Commercial

14+

Years in Business

0

7

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

8.9 / 10
Customer Reviews
100%
Certifications
90%
Experience
85%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Renewable Energy Design Group

Renewable Energy Design Group (RED Group) is a leading solar contractor in North Carolina and South Carolina, founded in 2012 and headquartered at 90 Beechwood Dr, Lewisville, NC 27023. The company serves Durham, Raleigh, Winston-Salem, Greensboro, Charlotte, and communities across both Carolinas with residential, commercial, and agricultural solar installations.

RED Group is a licensed general contractor and electrical contractor in North Carolina, designing and installing solar energy systems with battery storage options. The company also provides agricultural solar solutions for farms and rural properties. They maintain a BBB A+ rating and are listed as an approved installer on EnergySage.

On EnergySage, Renewable Energy Design Group holds a 5.0-star rating from 7 reviews. The company can be reached at their toll-free number 877-520-7652 or local line at 336-671-1068.

Service Area

Renewable Energy Design Group serves the following areas within a 124-mile radius:

DurhamRaleighWinston-SalemGreensboroCharlotte

Are you Renewable Energy Design Group?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Maintenance

Certifications & Accreditations

BBB A+ NC General Contractor License NC Electrical Contractor License

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

7 reviews

Verified Customer

5 September 2025
Verified Customer

RED Group designed and installed our agricultural solar array. Professional team with deep experience in ground-mount systems.

Verified Customer

20 June 2025
Verified Customer

Excellent communication and workmanship on our residential installation. They handled all permitting and interconnection seamlessly.

Verified Customer

15 March 2025
Verified Customer

Responsive and knowledgeable team. Our commercial system was installed on schedule and is producing above expectations.

Frequently Asked Questions About Renewable Energy Design Group

What services does Renewable Energy Design Group offer?

Renewable Energy Design Group offers Solar Installation, Battery Storage, Maintenance.

Is Renewable Energy Design Group NABCEP certified?

Renewable Energy Design Group holds the following certifications: BBB A+, NC General Contractor License, NC Electrical Contractor License. Contact them directly for the latest accreditation details.

What areas does Renewable Energy Design Group serve?

Renewable Energy Design Group serves Durham, Raleigh, Winston-Salem, Greensboro, Charlotte. They are based in Durham with a service radius of 200 km.

What warranty does Renewable Energy Design Group offer?

Renewable Energy Design Group offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Renewable Energy Design Group's customer reviews?

Renewable Energy Design Group has a 5/5 rating based on 7 customer reviews. Customers consistently rate them highly.

How long has Renewable Energy Design Group been in business?

Renewable Energy Design Group was founded in 2012 and has been in business for 14 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Renewable Energy Design Group

Fill in your details and we'll connect you with Renewable Energy Design Group.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote