AE

Alba Energy

Premier Texas solar EPC firm specializing in high-quality commercial and residential PV systems since 2013

Austin, Texas
4.6 (20 reviews)
Verified
Residential Commercial

13+

Years in Business

0

20

Customer Reviews

99 mi

Service Area

11-50

Employees

SurgePV Score

7.9 / 10
Customer Reviews
92%
Certifications
75%
Experience
85%
Services Range
100%
Warranty Coverage
63%
Online Presence
25%

About Alba Energy

Alba Energy is a Texas-based solar EPC (Engineering, Procurement, and Construction) firm founded in 2013 and headquartered at 1601 Rio Grande in Austin. The company specializes in the design, engineering, and construction of commercial and residential solar PV systems, with a particular strength in larger commercial projects that require detailed engineering and careful project management.

As both a design and installation firm, Alba Energy handles the full project lifecycle from initial site assessment through system commissioning. The company installs panels from Qcells, Canadian Solar, and Trina Solar alongside inverters from Enphase, SolarEdge, and SMA. Battery storage options include Tesla Powerwall and Enphase IQ Battery systems. Alba Energy’s engineering-first approach makes them a strong fit for complex commercial installations where system design and structural analysis are critical.

Alba Energy holds a 4.6-star rating on EnergySage from 20 reviews and is an approved installer on the platform. The company is BBB-accredited and registered with Austin Energy as a participating solar contractor. Alba serves the broader Texas market, with projects across the Austin, San Antonio, Houston, and Dallas metro areas.

Service Area

Alba Energy serves the following areas within a 99-mile radius:

AustinSan AntonioHoustonDallasRound RockGeorgetownKyleNew Braunfels

Are you Alba Energy?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
Solar Design
Commercial Solar
Grid Connection
Energy Audit
Maintenance

Certifications & Accreditations

BBB Accredited NABCEP

Partner Manufacturers

Panels

QcellsCanadian SolarTrina Solar

Inverters

EnphaseSolarEdgeSMA

Batteries

Tesla PowerwallEnphase IQ Battery

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.6

20 reviews

Brian T.

12 July 2025
Verified Customer

Alba Energy designed and installed a 50 kW commercial system for our office building. The engineering team was thorough and the project came in on time and on budget. Production is exceeding our forecasts.

Rachel W.

20 April 2025
Verified Customer

We hired Alba for a residential install and were impressed by their professionalism. The design maximized our limited roof space and the system looks clean and well-integrated with our home.

Mark J.

5 December 2024
Verified Customer

Solid company with good engineering capability. The commercial project went smoothly. The only reason for four stars is the timeline was slightly longer than originally quoted, but the end result was worth it.

Frequently Asked Questions About Alba Energy

What services does Alba Energy offer?

Alba Energy offers Solar Installation, Battery Storage, Solar Design, Commercial Solar, Grid Connection, Energy Audit, Maintenance.

Is Alba Energy NABCEP certified?

Yes, Alba Energy is NABCEP certified and also holds BBB Accredited certification. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does Alba Energy serve?

Alba Energy serves Austin, San Antonio, Houston, Dallas, Round Rock, Georgetown, Kyle, New Braunfels. They are based in Austin with a service radius of 160 km.

What warranty does Alba Energy offer?

Alba Energy offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are Alba Energy's customer reviews?

Alba Energy has a 4.6/5 rating based on 20 customer reviews. Customers consistently rate them highly.

How long has Alba Energy been in business?

Alba Energy was founded in 2013 and has been in business for 13 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Alba Energy

Fill in your details and we'll connect you with Alba Energy.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote