All Bay Solar
Full-service San Francisco solar, energy storage, roofing, and construction company since 2011
15+
Years in Business
39
Customer Reviews
50 mi
Service Area
11-50
Employees
SurgePV Score
About All Bay Solar
All Bay Solar Construction is a full-service solar integration company headquartered at 5743 Mission Street in San Francisco’s Excelsior district. Founded in 2011 and BBB-accredited with an A+ rating, the company designs and installs residential and commercial solar energy systems, battery storage, roofing, and electrical services throughout the San Francisco Bay Area.
All Bay Solar installs modules from Canadian Solar, microinverters from Enphase Energy, and battery storage from Tesla and SunPower. The company also uses mounting hardware from Unirac and Quick Mount PV. As a full-service contractor, All Bay Solar can handle every step of the solar installation process from initial system design through final inspection and utility interconnection, including roof work when needed.
On Yelp, All Bay Solar has 39 reviews, and on TrustAnalytica the company holds a 4.4-star rating. Customers frequently praise the convenience of working with a single contractor for solar, roofing, and electrical needs. The company operates Monday through Friday from 8am to 4:30pm.
Service Area
All Bay Solar serves the following areas within a 50-mile radius:
Contact Information
Are you All Bay Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.4
39 reviews
Tony R.
All Bay Solar handled our solar and roof replacement together. Great quality work and competitive pricing. The team was professional throughout.
Christine L.
Tom and his crew did an excellent job on our installation. They were knowledgeable about SF permitting and handled everything smoothly.
Bryan H.
Good experience with All Bay Solar. Professional installation and fair pricing. The system is working well and producing as expected.
Frequently Asked Questions About All Bay Solar
What services does All Bay Solar offer?
All Bay Solar offers Solar Installation, Battery Storage, roofing, electrical, Maintenance.
Is All Bay Solar NABCEP certified?
All Bay Solar holds the following certifications: BBB Accredited, CSLB Licensed. Contact them directly for the latest accreditation details.
What areas does All Bay Solar serve?
All Bay Solar serves San Francisco, Oakland, Berkeley, Daly City, San Mateo, Marin County. They are based in San Francisco with a service radius of 80 km.
What warranty does All Bay Solar offer?
All Bay Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are All Bay Solar's customer reviews?
All Bay Solar has a 4.4/5 rating based on 39 customer reviews. They are well-regarded by their customers.
How long has All Bay Solar been in business?
All Bay Solar was founded in 2011 and has been in business for 15 years. They are one of the more experienced solar installers in their area.
Similar Installers in San Francisco
Get a Free Solar Quote from All Bay Solar
Fill in your details and we'll connect you with All Bay Solar.
Quote request sent!
All Bay Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile