PS

Pickett Solar

Family-owned commercial solar contractor with in-house engineering serving California's Central Valley since 1988

Fresno, California
5 (14 reviews)
Verified
Commercial Industrial

38+

Years in Business

0

14

Customer Reviews

124 mi

Service Area

11-50

Employees

SurgePV Score

9.2 / 10
Customer Reviews
100%
Certifications
90%
Experience
100%
Services Range
75%
Warranty Coverage
80%
Online Presence
100%

About Pickett Solar

Pickett Solar is a commercial solar contractor headquartered at 7395 N. Palm Bluffs Ave, Suite 101, Fresno, CA 93711. A division of Don Pickett & Associates, the company was founded in 1988 as a family-owned corporation and has been serving the Central Valley for over 35 years.

Pickett Solar offers in-house architectural design, drafting, and civil engineering services. They specialize in agricultural, governmental, and commercial solar systems, serving clients across the Central Valley from Sacramento to Bakersfield and the Central Coast. The company holds CSLB License 541612 and maintains active memberships in the Building Industry Association, CALSEIA, and several agricultural industry organizations.

The company focuses exclusively on commercial and industrial projects, providing custom-designed solar solutions for farms, dairies, businesses, and government facilities throughout Central California.

Service Area

Pickett Solar serves the following areas within a 124-mile radius:

FresnoSacramentoBakersfieldVisaliaModesto

Are you Pickett Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
system_design
engineering

Certifications & Accreditations

CSLB License 541612 CALSEIA Member Building Industry Association Member

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

25 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

5

14 reviews

Verified Customer

20 August 2025
Verified Customer

Pickett Solar designed and installed a large commercial system for our agricultural operation. Their in-house engineering team made the permitting process smooth. System has been reliable since day one.

Verified Customer

10 May 2025
Verified Customer

Outstanding commercial solar contractor. The team understood our energy needs and designed a system that reduced our operating costs significantly. Decades of experience shows in their work.

Verified Customer

14 February 2025
Verified Customer

Worked with Pickett Solar on a ground-mount system for our farm. Professional from start to finish, and the in-house architectural and civil engineering services saved us time and money.

Frequently Asked Questions About Pickett Solar

What services does Pickett Solar offer?

Pickett Solar offers Solar Installation, system_design, engineering.

Is Pickett Solar NABCEP certified?

Pickett Solar holds the following certifications: CSLB License 541612, CALSEIA Member, Building Industry Association Member. Contact them directly for the latest accreditation details.

What areas does Pickett Solar serve?

Pickett Solar serves Fresno, Sacramento, Bakersfield, Visalia, Modesto. They are based in Fresno with a service radius of 200 km.

What warranty does Pickett Solar offer?

Pickett Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.

How are Pickett Solar's customer reviews?

Pickett Solar has a 5/5 rating based on 14 customer reviews. Customers consistently rate them highly.

How long has Pickett Solar been in business?

Pickett Solar was founded in 1988 and has been in business for 38 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Pickett Solar

Fill in your details and we'll connect you with Pickett Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote