AS

All Solar Power

Locally owned Tampa solar company providing solar solutions since 1977

Tampa, Florida
3.3 (30 reviews)
Verified
Residential Commercial

49+

Years in Business

0

30

Customer Reviews

50 mi

Service Area

2-10

Employees

SurgePV Score

7.1 / 10
Customer Reviews
66%
Certifications
60%
Experience
100%
Services Range
75%
Warranty Coverage
63%
Online Presence
50%

About All Solar Power

All Solar Power is a locally owned and operated solar company headquartered at 9259 Lazy Lane in Tampa, Florida. Founded in 1977, it is one of the longest-operating solar companies in the Tampa Bay area with nearly five decades of experience in solar energy solutions. The company serves both residential and commercial customers.

All Solar Power offers solar panel installation, solar system maintenance, solar panel cleaning, solar system repair, and solar pool heating services. The company holds NABCEP certification and installs products from Luma Solar and Rheem. The additional phone line (813) 932-0972 provides an alternate contact for inquiries.

The company’s nearly half-century of continuous operation in the Tampa Bay market reflects deep familiarity with local building codes, utility interconnection requirements, and the specific weather conditions that affect solar system design and performance in the region.

Service Area

All Solar Power serves the following areas within a 50-mile radius:

TampaSt. PetersburgClearwaterBrandonLargo

Are you All Solar Power?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Maintenance
solar_pool_heating

Certifications & Accreditations

NABCEP

Partner Manufacturers

Panels

Luma Solar

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

10 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

3.3

30 reviews

Verified Customer

28 July 2025
Verified Customer

All Solar Power has been in the business for decades and it shows. They knew exactly what our home needed and delivered a great system.

Verified Customer

15 May 2025
Verified Customer

Experienced team with good knowledge of solar systems. The installation was completed on time and the system works well.

Verified Customer

20 March 2025
Verified Customer

Decent installation but communication could have been better during the process. The system itself is performing as expected.

Frequently Asked Questions About All Solar Power

What services does All Solar Power offer?

All Solar Power offers Solar Installation, Maintenance, solar_pool_heating.

Is All Solar Power NABCEP certified?

Yes, All Solar Power is NABCEP certified. NABCEP certification is the gold standard for solar professionals in the United States.

What areas does All Solar Power serve?

All Solar Power serves Tampa, St. Petersburg, Clearwater, Brandon, Largo. They are based in Tampa with a service radius of 80 km.

What warranty does All Solar Power offer?

All Solar Power offers 25-year panel warranty, 12-year inverter warranty, and 10-year installation/workmanship warranty.

How are All Solar Power's customer reviews?

All Solar Power has a 3.3/5 rating based on 30 customer reviews. See individual reviews on this page for more detail.

How long has All Solar Power been in business?

All Solar Power was founded in 1977 and has been in business for 49 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from All Solar Power

Fill in your details and we'll connect you with All Solar Power.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote