AS

Alltech Solar

San Diego solar contractor since 1995 with a 25-year workmanship warranty and top 1% BuildZoom ranking

San Diego, California
4.7 (119 reviews)
Verified
Residential Commercial

31+

Years in Business

0

119

Customer Reviews

50 mi

Service Area

1-10

Employees

SurgePV Score

8.8 / 10
Customer Reviews
94%
Certifications
75%
Experience
100%
Services Range
90%
Warranty Coverage
83%
Online Presence
75%

About Alltech Solar

Alltech Solar is a San Diego-based solar and electrical contractor established in 1995. Located at 4079 Governor Dr, Suite 307 in the University City neighborhood, the company provides residential and commercial solar installations, battery storage systems, and electrical services. Alltech Solar holds C-10 (electrical), C-46 (solar), C-22 (mechanical), and B (general) contractor licenses, making it one of the most broadly licensed solar contractors in the area.

The company is BBB-accredited with an A+ rating and offers an industry-leading 25-year workmanship warranty to match panel manufacturer warranties. On BuildZoom, Alltech Solar’s score of 129 places it in the top 1% of 336,931 California licensed contractors. The company specializes in both grid-interactive and off-grid solar installations with battery storage.

On Google, Alltech Solar holds a 4.7-star rating, with a perfect 5-star rating on both Yelp and Facebook. Customers highlight the company’s expertise, fair pricing, and commitment to quality. Alltech Solar serves San Diego County with a focus on personalized system design for each customer’s unique energy profile.

Service Area

Alltech Solar serves the following areas within a 50-mile radius:

San DiegoLa JollaUniversity CityClairemontMira MesaPowayDel Mar

Are you Alltech Solar?

Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.

Try SurgePV Free

Services Offered

Solar Installation
Battery Storage
electrical
Maintenance

Certifications & Accreditations

BBB Accredited CSLB Licensed

Partner Manufacturers

Warranty Coverage

Panel Warranty

25 years

Inverter Warranty

12 years

Installation Warranty

25 years

What to Expect: Solar Installation Process

1

Initial Consultation

Free site survey and system design

2

Quote & Design

Detailed proposal with costs and savings

3

Installation

Panels, inverter, and wiring (1-3 days)

4

Inspection

City inspection and utility interconnection approval

5

Go Live

Utility grants PTO, system goes live

Customer Reviews

4.7

119 reviews

Scott P.

5 September 2025
Verified Customer

Alltech Solar did an outstanding job on our system. They were thorough in explaining our options and the installation was completed quickly and cleanly.

Maria C.

18 July 2025
Verified Customer

Great local company. They have been around for decades and it shows in the quality of their work. Very satisfied with the entire experience.

Greg W.

30 April 2025
Verified Customer

Competitive pricing and excellent workmanship. The 25-year warranty gives us real peace of mind. Would recommend to anyone in San Diego.

Frequently Asked Questions About Alltech Solar

What services does Alltech Solar offer?

Alltech Solar offers Solar Installation, Battery Storage, electrical, Maintenance.

Is Alltech Solar NABCEP certified?

Alltech Solar holds the following certifications: BBB Accredited, CSLB Licensed. Contact them directly for the latest accreditation details.

What areas does Alltech Solar serve?

Alltech Solar serves San Diego, La Jolla, University City, Clairemont, Mira Mesa, Poway, Del Mar. They are based in San Diego with a service radius of 80 km.

What warranty does Alltech Solar offer?

Alltech Solar offers 25-year panel warranty, 12-year inverter warranty, and 25-year installation/workmanship warranty.

How are Alltech Solar's customer reviews?

Alltech Solar has a 4.7/5 rating based on 119 customer reviews. Customers consistently rate them highly.

How long has Alltech Solar been in business?

Alltech Solar was founded in 1995 and has been in business for 31 years. They are one of the more experienced solar installers in their area.

Get a Free Solar Quote from Alltech Solar

Fill in your details and we'll connect you with Alltech Solar.

Is this your business?

Claim this profile to manage your listing, respond to reviews, and receive leads.

Claim Your Profile
Get a Free Quote