Arc Energy Solutions
Bakersfield solar and battery storage specialist for residential and commercial clients
2026+
Years in Business
26
Customer Reviews
62 mi
Service Area
2-10
Employees
SurgePV Score
About Arc Energy Solutions
Arc Energy Solutions is a Bakersfield-based solar installation company located at 6615 Rosedale Hwy, Bakersfield, CA 93308. Owned by Stephen Moynier, the company specializes in residential and commercial solar panel systems and battery storage solutions.
Arc Energy Solutions holds California State License Board contractor license #1121783 and BBB accreditation. The company offers complete solar installation services including system design, permitting, installation, and roofing services designed to work with solar panels.
Open Monday through Friday from 10:00 AM to 6:00 PM and Saturday from 9:00 AM to 3:00 PM, Arc Energy Solutions provides free consultations and solar assessments for Bakersfield and Kern County property owners.
Service Area
Arc Energy Solutions serves the following areas within a 62-mile radius:
Contact Information
Are you Arc Energy Solutions?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
26 reviews
Verified Customer
Arc Energy Solutions provided a thorough consultation and designed a solar system that perfectly fits our energy needs. Stephen was responsive and professional.
Verified Customer
Excellent local company. The commercial solar installation was completed on schedule and the system is producing exactly as projected.
Verified Customer
Good experience with Arc Energy. The team handled all the permitting and utility paperwork. Fair pricing for Bakersfield.
Frequently Asked Questions About Arc Energy Solutions
What services does Arc Energy Solutions offer?
Arc Energy Solutions offers Solar Installation, Battery Storage, Maintenance.
Is Arc Energy Solutions NABCEP certified?
Arc Energy Solutions holds the following certifications: CSLB #1121783, BBB Accredited. Contact them directly for the latest accreditation details.
What areas does Arc Energy Solutions serve?
Arc Energy Solutions serves Bakersfield, Delano, Shafter, Wasco, Tehachapi. They are based in Bakersfield with a service radius of 100 km.
What warranty does Arc Energy Solutions offer?
Arc Energy Solutions offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Arc Energy Solutions's customer reviews?
Arc Energy Solutions has a 4.8/5 rating based on 26 customer reviews. Customers consistently rate them highly.
How long has Arc Energy Solutions been in business?
Arc Energy Solutions was founded in 0 and has been in business for 2026 years. They are one of the more experienced solar installers in their area.
Similar Installers in Bakersfield
Get a Free Solar Quote from Arc Energy Solutions
Fill in your details and we'll connect you with Arc Energy Solutions.
Quote request sent!
Arc Energy Solutions will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile