Arch Solar
Wisconsin's top-ranked solar company with 15 NABCEP-certified professionals and 20+ years of experience
23+
Years in Business
3,000+
Projects Completed
200
Customer Reviews
93 mi
Service Area
51-200
Employees
SurgePV Score
About Arch Solar
Arch Solar, operating under Arch Electric, is Wisconsin’s premier solar installation company, founded in 2003 in Plymouth. The company has grown into a vertically integrated solar provider with offices in Plymouth, Milwaukee, and Madison, handling everything from design and engineering to installation and maintenance entirely in-house. Arch Solar has 15 NABCEP-certified professionals on staff and runs an in-house apprenticeship program with licensed electricians.
The company serves residential and commercial clients across the full state of Wisconsin, with particular strength in the Milwaukee and Madison markets. Arch Solar was selected as the lead installer for the Grow Solar Milwaukee-Waukesha program, a community buying initiative organized by the Midwest Renewable Energy Association and the City of Milwaukee that helps homeowners pool purchasing power for competitive solar pricing. Services include solar panel installation, battery storage, EV charging, and ongoing monitoring.
Arch Solar has been ranked as a Solar Power World Top Solar Contractor for eight consecutive years and is currently ranked 91st in the nation for solar installations. The company holds an A+ rating from the Better Business Bureau and maintains a 4.7-star customer rating across review platforms. Their Milwaukee office at 7764 N 81st Street provides convenient access for homeowners throughout southeastern Wisconsin.
Service Area
Arch Solar serves the following areas within a 93-mile radius:
Contact Information
Are you Arch Solar?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.7
200 reviews
Jennifer M.
Arch Solar designed and installed an 11 kW system on our Milwaukee home. The entire process from consultation to activation took about six weeks. The crew was professional, and the system has been producing above the initial estimates for three months now.
Scott H.
We chose Arch because they were selected as the installer for the Grow Solar Milwaukee program, which gave us confidence in their pricing and quality. Everything was handled in-house with no subcontractors. Very happy with the result.
Emily T.
Solid installation and good communication throughout. The 15 NABCEP-certified staff members on their team is impressive. The only minor issue was a brief delay in the utility inspection scheduling, but Arch handled that on our behalf.
Frequently Asked Questions About Arch Solar
What services does Arch Solar offer?
Arch Solar offers Solar Installation, Battery Storage, Solar Design, EV Charging, Monitoring, Maintenance, Commercial Solar.
Is Arch Solar NABCEP certified?
Yes, Arch Solar is NABCEP certified and also holds BBB A+ Rating, Solar Power World Top Contractor certifications. NABCEP certification is the gold standard for solar professionals in the United States.
What areas does Arch Solar serve?
Arch Solar serves Milwaukee, Madison, Plymouth, Waukesha, Brookfield, Wauwatosa, Racine, Kenosha and 2 other areas. They are based in Milwaukee with a service radius of 150 km.
What warranty does Arch Solar offer?
Arch Solar offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Arch Solar's customer reviews?
Arch Solar has a 4.7/5 rating based on 200 customer reviews. Customers consistently rate them highly.
How long has Arch Solar been in business?
Arch Solar was founded in 2003 and has been in business for 23 years. They are one of the more experienced solar installers in their area.
Similar Installers in Milwaukee
Get a Free Solar Quote from Arch Solar
Fill in your details and we'll connect you with Arch Solar.
Quote request sent!
Arch Solar will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile