Artisan Electric
Largest residential and commercial solar installer using licensed union electricians in Washington
19+
Years in Business
181
Customer Reviews
50 mi
Service Area
51-100
Employees
SurgePV Score
About Artisan Electric
Artisan Electric is the largest residential and commercial solar installer in Washington utilizing licensed union electricians (IBEW). Founded in 2007 on Vashon Island and now headquartered at 969 S Nebraska Street, Suite A in Seattle, the company has grown into one of the Pacific Northwest’s leading solar and electrical contractors.
Artisan Electric was the first certified Tesla Solar Roof installer in Washington State and is also a Tesla Powerwall Certified Installer. The company handles solar PV installations, battery storage systems, EV charging station installation, and general electrical work. All installations are performed by licensed IBEW union electricians, which the company highlights as a commitment to quality craftsmanship and fair labor practices.
The company holds a 4.8-star rating across review platforms with 181 reviews on Birdeye. Customers regularly praise the transparency of pricing and project timelines. Artisan Electric offers free solar site assessments, free electrical quotes, and free EV charging station quotes. Office hours are Monday through Friday, 8:00 AM to 5:00 PM.
Service Area
Artisan Electric serves the following areas within a 50-mile radius:
Contact Information
Are you Artisan Electric?
Claim your profile and try SurgePV — the solar design platform that cuts project time by 60%.
Services Offered
Certifications & Accreditations
Partner Manufacturers
Panels
Inverters
Batteries
Warranty Coverage
25 years
25 years
10 years
What to Expect: Solar Installation Process
Initial Consultation
Free site survey and system design
Quote & Design
Detailed proposal with costs and savings
Installation
Panels, inverter, and wiring (1-3 days)
Inspection
City inspection and utility interconnection approval
Go Live
Utility grants PTO, system goes live
Customer Reviews
4.8
181 reviews
Georgetown Homeowner
After comparing six different installers, Artisan stood out for expertise, transparency, and customer care. The union electricians did impeccable work.
West Seattle Customer
Professional from start to finish. Pricing was transparent, timelines were met, and the installation crew was exceptionally skilled and courteous.
Ballard Resident
Great installation quality and knowledgeable team. Communication during the permitting phase could have been slightly better but overall very satisfied.
Frequently Asked Questions About Artisan Electric
What services does Artisan Electric offer?
Artisan Electric offers Solar Installation, Battery Storage, EV Charging, electrical_services.
Is Artisan Electric NABCEP certified?
Artisan Electric holds the following certifications: Tesla Solar Roof Certified, Tesla Powerwall Certified, IBEW Union Labor. Contact them directly for the latest accreditation details.
What areas does Artisan Electric serve?
Artisan Electric serves Seattle, Tacoma, Bellevue, Everett, Olympia. They are based in Seattle with a service radius of 80 km.
What warranty does Artisan Electric offer?
Artisan Electric offers 25-year panel warranty, 25-year inverter warranty, and 10-year installation/workmanship warranty.
How are Artisan Electric's customer reviews?
Artisan Electric has a 4.8/5 rating based on 181 customer reviews. Customers consistently rate them highly.
How long has Artisan Electric been in business?
Artisan Electric was founded in 2007 and has been in business for 19 years. They are one of the more experienced solar installers in their area.
Similar Installers in Seattle
Get a Free Solar Quote from Artisan Electric
Fill in your details and we'll connect you with Artisan Electric.
Quote request sent!
Artisan Electric will be in touch within 1-2 business days.
Is this your business?
Claim this profile to manage your listing, respond to reviews, and receive leads.
Claim Your Profile